INSP-Final Inspection | 2/25/2004 | 2/25/2004 | 2/25/2004 | P | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 2/25/2004 | 2/25/2004 | 2/25/2004 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 2/25/2004 1:42:06 PM
|
INSP-Final Inspection | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | FAIL |
Rick Jackson
|
|
|
We would like a final this PM. Please
call prior to arrival; Phone #: ###-#### Internet Inspection Request from: Trent Bice west courtyard corridor is not completed - need armovers for two drop in soffit 2/24/2004 4:22:35 PM
|
INSP-Final Inspection | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | FAIL |
Rick Jackson
|
|
|
We would like a final this PM. Please
call prior to arrival; Phone #: ###-#### Internet Inspection Request from: Trent Bice west courtyard corridor is not completed - need armovers for two drop in soffit 2/24/2004 4:22:35 PM
|
Plan assigned to (Bill) | 11/4/2003 | | 2/20/2004 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 11/4/2003 | | 2/20/2004 | | PASS |
Bill Alexander
|
|
|
No Review. Wrong permit submitted under.
11/04/2003 Plan correction/changes, connection of basement standpipe piping from PA-2 and PA-1, addition of PRV for fire pump.
Problem with resubmittals. Called Don Weland and asked for more information, i.e., data submittals on PRV, verification of hydraulics that 175 psi maximum pump pressure will be sufficiant for most remote/demanding area calculations.
02/20/2004 - No PRV required for this building. Ok'd the interconection to grid line 13 in Basement Parking Garage BLD03-00067.
|
Telephone call | | | 11/10/2003 | | DONE |
|
|
|
Problem with resubmittals. Called Don Weland and asked for more information, i.e., data submittals on PRV, verification of hydraulics that 175 psi maximum pump pressure will be sufficiant for most remote/demanding area calculations.
|
Plan resubmittals received | | | 11/4/2003 | | |
Bill Alexander
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 9/23/2003 | 9/24/2003 | 9/24/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/23/2003 at 1:56:41 PM. Contact: ###-####. hydro okay 9/24/2003 12:22:21 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/22/2003 | 9/23/2003 | 9/23/2003 | A | NR |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/22/2003 at 2:26:28 PM. Contact: ###-####. hydro didn't hold for retail 9/23/2003 1:10:23 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/30/2003 | 7/31/2003 | 7/31/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 7/30/2003 at 11:52:21 AM. Contact: ###-####. installed per resubmittals 7/31/2003 3:10:25 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/29/2003 | 7/30/2003 | 7/30/2003 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 7/29/2003 at 10:00:42 AM. Contact: ###-####. talked to Mike B and he will reschedule for 7/31 7/30/2003 11:32:43 AM
|
Issue and Print Permit | | | 7/24/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/22/2003 | | 7/23/2003 | | PASS |
Bill Alexander
|
|
|
Field Changes/modifications.
|
Plan assigned to (Bill) | 7/22/2003 | | 7/23/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/23/2003 | | DONE |
Bill Alexander
|
|
|
|
Telephone call | | | 7/23/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Plan resubmittals received | | | 7/22/2003 | | DONE |
|
|
|
Field Changes/modifications.
|
INSP-Sprinkler Rough-in/Hydro | 7/7/2003 | 7/8/2003 | 7/8/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 7/7/2003 at 2:34:48 PM. Contact: ###-####. need resubmittals for pipe changes and standpipe changes; need listing for fire stopping standpipe through floor/ceiling assembly; EQ needed; need heat to maintain 40 degrees in north rooms where main enters building through vestibule and bike room 7/8/2003 4:25:01 PM
|
FIR-Aging Inspection | 6/17/2003 | 6/17/2003 | 6/17/2003 | | PASS |
Rick Jackson
|
|
|
work is still in progress 6/17/2003 9:58:56 AM
|
Telephone call | | | 5/5/2003 | | DONE |
Bill Alexander
|
|
|
Emailed copy to Randy Knudsen (Shilo-PA2) and Randy Bowron (De Best-Idaho Water Project).
Since the parking garage is connected to the Idaho Water Center Project the following will apply:
1. The basement garage standpipe system/s are dry. Each shall be interconnected between the 2 buildings at the basement level. With this requirement, the garage standpipe piping shall be separated from the above parking garage grade standpipes with separate identified standpipe FDC's located at approved locations on each structure.
2. The stairwell standpipes may be dry in both buildings, which means they do not require connection to the building fire pump/s. This means, the pump/s do not require sizing for standpipe fire flows and pressures. (Piping will still require sizing and design per NFPA 14). The stairwells shall be separated from the parking garage standpipes in each building and each building shall have its own a separate identified standpipe FDC.
3. In addition to the above identified FDC's, signage shall be attached to the stairwell standpipes FDC's that identify the standpipes and gives the minimum required pressures at the supply (connection), to provide the minimum pressure and required flows per NFPA 14:5-7, 5-9, (500 gpm @ 100 psi on the most remote standpipe (on the stairwells)! Note: Each standpipe hose connection (in the basement and the stairwells) shall require an approved water pressure gauge with control connection appurtenance.
|
Meeting | | | 5/5/2003 | | DONE |
|
|
|
Met with Dave Miller concerning this project and the Idaho Water Project. Went into details on connecting standpipes in the basement and allowance for dry standpipes in the stairwells. Basement and stairwell standpipes to be separated. from the basement parking garage. Basement dry standpipes to be interconnected between the two buildings, since they are both open (connected).
|
Issue permit | | | 3/13/2003 | | |
|
|
|
|
Plan assigned to (Bill) | 3/3/2003 | | 3/12/2003 | | DONE |
|
|
|
3/12/2003 13:38:02 JWA - activity updated through activity FIRA22 from case FIR03-00088.
|
Sprinkler Plan Check | 3/3/2003 | | 3/12/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/12/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 3/12/2003 | | 3/12/2003 | | DONE |
|
|
|
|
Telephone call | | | 3/12/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Application received | | | 3/3/2003 | | |
|
|
|
|
Sprinkler Plan Check | 2/18/2003 | | 2/24/2003 | | FAIL |
Bill Alexander
|
|
|
No permit application provided for this work submitted (different building permit).
|