INSP-Final Inspection | 6/18/2003 | 6/18/2003 | 6/18/2003 | P | PASS |
Troy Cobbley
|
|
|
Supply line cover, flush and hydro is OK
|
DOC - Permit Finaled | 6/18/2003 | 6/18/2003 | 6/18/2003 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 6/18/2003 3:51:36 PM
|
INSP-Supply line flush | 6/17/2003 | 6/17/2003 | 6/17/2003 | A | PASS |
Troy Cobbley
|
|
|
supply line flush is OK 6/17/2003 10:53:20 AM
|
Plan resubmittals received | | | 4/28/2003 | | |
|
|
|
|
INSP-Conference | 4/18/2003 | 4/21/2003 | 4/21/2003 | P | PART |
Troy Cobbley
|
|
|
Inspection was for underground supply cover. Underground is ok to cover. United Water still needs to make their connection 4/21/2003 3:59:51 PM
|
INSP-Conference | 3/18/2003 | 3/19/2003 | 3/19/2003 | P | PASS |
Troy Cobbley
|
|
|
Underground supply, 15' of stub out is ok to cover 3/19/2003 2:08:28 PM
|
INSP-Conference | 3/17/2003 | 3/18/2003 | 3/18/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 3/17/2003 at 3:01:09 PM. Contact: ###-####.
|
Issue permit | | | 3/10/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 3/7/2003 | | 3/7/2003 | | DONE |
|
|
|
|
Telephone call | | | 3/7/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Application received | | | 3/7/2003 | | |
|
|
|
|
Plan assigned to (Bill) | 3/7/2003 | | 3/7/2003 | | DONE |
|
|
|
3/7/2003 15:03:35 JWA - activity updated through activity FIRA22 from case FIR03-00099.
|
Sprinkler Plan Check | 3/7/2003 | | 3/7/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/7/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 3/7/2003 | | | | |
|
|
|
|