INSP-Final Inspection | 12/31/2003 | 12/31/2003 | 12/31/2003 | P | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 12/31/2003 | 12/31/2003 | 12/31/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 12/31/2003 1:55:31 PM
|
INSP-Final Inspection | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/30/2003 at 5:48:12 PM. Contact: ###-####. need updated maps; verify all covers are off the smoke detectors 10/1/2003 12:48:51 PM
|
INSP-Alarm Testing | 9/29/2003 | 9/29/2003 | 9/29/2003 | A | PART |
Rick Jackson
|
|
|
tested all exsisting sprinkler control tampers and flows- okay; tested new residential tampers and flows - okay; still need to verify phase reversal for fire pump
|
INSP-Alarm Testing | 9/25/2003 | 9/26/2003 | 9/26/2003 | A | FAIL |
Rick Jackson
|
|
|
smoke detectors need to be within 12 inches of deck in stairs and elevator machine room; need heat detectors added in elevator machine rooms; descriptor for first floor NAC detector and location has changed to update map also; need to test elevator recall and all flows and tampers; reverify phase reversal on fire pump; batteries not supervised; strobes in ADA sleeping rooms within 24 inches to be 177cd or lower strobe; need circuit breaker location on NAC's with lockout; tested location of devices on all living floors -okay; tested notification devices on all living floors - okay except ADA rooms; need updated maps and NFPA 72 forms when complete 9/26/2003 12:10:45 PM
|
INSP-Final Inspection | 9/25/2003 | 9/25/2003 | 9/25/2003 | P | FAIL |
Rick Jackson
|
|
|
started testing alarms - detectors within 3 ft of diffusers; fire pump controller not reporting phase reversal and showed pump running when pump wasn't running; phone line not reporting trouble; need special function buttons labeled; batteries not reporing troubles; will need to test devices and all exsisting sprinkler valves; need maps; will continue testing on 9/26 9/25/2003 4:13:57 PM
|
INSP-Sprinkler Rough-in/Hydro | 7/1/2003 | 7/3/2003 | 7/3/2003 | P | PART |
Rick Jackson
|
|
|
Could the inspection be scheduled at
1:30 pm.; Phone #: ###-#### Internet Inspection Request from: Paul Highley alarms are okay on first floor operations area only 7/3/2003 2:54:31 PM
|
Issue permit | | | 5/27/2003 | | |
|
|
|
|
Inspection Record Card- Fire | 5/23/2003 | | 5/23/2003 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 3/10/2003 | | 5/22/2003 | | DONE |
|
|
|
5/22/2003 16:32:37 M_F - activity updated through activity FIRA22 from case FIR03-00104.
|
Alarm Plan Check | | | 5/22/2003 | | PASS |
|
|
|
3rd review- satisfactory pending field verification of conditional items.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/22/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/12/2003 | | |
|
|
|
|
Alarm Plan Check | | | 5/8/2003 | | FAIL |
|
|
|
Conditional Approval to begin installation
|
Alarm Plan Check | 4/4/2003 | | 4/15/2003 | | FAIL |
|
|
|
Review of revised plans. Resubmittal required. Review comments faxed to applicant, Synergy.
|
Telephone call | | | 3/25/2003 | | DONE |
|
|
|
Troy Cobbley called Synergy and discussed prliminary plan review issues with Paul Highley. Advised him that we cannot complete review until the Plan modification review is complete to ensure FA plans match the Bldg permit approved plans. Suggested changes they may wish to resubmit. Paul will do so. Also spoke with a rep from Romar, who called regarding status of plan review.
|
Application received | | | 3/10/2003 | | |
|
|
|
|
Alarm Plan Check | | | 3/24/2002 | | HOLD |
|
|
|
building permit review not yet completed; cannot complete FA review. Did prelimiary review and called Paul Highley, Synergy with some questions and items that will need to be addressed befor plans are approved; not available, left a message for him to call back.
|
Inspection Record Card- Fire | 5/23/2003 | | | | |
|
|
|
|