INSP-Final Inspection | 5/16/2003 | 5/16/2003 | 5/16/2003 | P | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 5/16/2003 | 5/16/2003 | 5/16/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 5/16/2003 2:09:20 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/12/2003 | 5/13/2003 | 5/13/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/12/2003 at 11:25:44 AM. 5/13/2003 9:28:25 AM taped heads in bar area - will need to verify type head; need aux drain signs; 200 and 155 degree heads installed in kitchen - 200 degree would be better application 5/13/2003 9:57:28 AM
|
Application received | | | 3/11/2003 | | |
|
|
|
|
Plan assigned to (Bill) | 3/11/2003 | | 3/11/2003 | | DONE |
|
|
|
3/11/2003 15:33:35 JWA - activity updated through activity FIRA22 from case FIR03-00111.
|
Sprinkler Plan Check | 3/11/2003 | | 3/11/2003 | | PASS |
Bill Alexander
|
|
|
Limited to one stairsase work only.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/11/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 3/11/2003 | | 3/11/2003 | | DONE |
|
|
|
|
Issue permit | | | 3/11/2003 | | DONE |
|
|
|
|