INSP-Final Inspection | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | PASS |
Troy Cobbley
|
|
|
|
DOC - Permit Finaled | 9/19/2003 | 9/19/2003 | 9/19/2003 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 9/19/2003 1:00:45 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/8/2003 | 9/9/2003 | 9/9/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/8/2003 at 2:56:05 PM. Contact: ###-####. hydro on overhead okay 9/9/2003 11:13:33 AM
|
INSP-Supply line flush | 9/5/2003 | 9/8/2003 | 9/8/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/5/2003 at 1:24:30 PM. Contact: ###-####. UG hydro okay; will give ther UG certificate to Troy 9/8/2003 11:08:56 AM
|
INSP-Sprinkler Rough-in | 9/4/2003 | 9/4/2003 | 9/4/2003 | P | FAIL |
Troy Cobbley
|
|
|
see approved plans for deficiancy locations 9/4/2003 3:39:12 PM
|
INSP-Supply line flush | 7/21/2003 | 7/22/2003 | 7/22/2003 | A | PASS |
Troy Cobbley
|
|
|
supply line flush ok 7/22/2003 8:17:31 AM
|
INSP-Supply line flush | 7/18/2003 | 7/21/2003 | 7/21/2003 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was for rough-in on north wing. See approved plans for areas with deficiencies. 7/21/2003 10:26:55 AM
|
INSP-Sprinkler Rough-in/Hydro | 7/17/2003 | 7/18/2003 | 7/18/2003 | P | FAIL |
Troy Cobbley
|
|
|
Rough-in inspection performed on the east, west and south wings. North wing still needs to be done. Separation between the east wing and the living area is an issue. Earthquake bracing needs to be moved to the top chord of the trusses or get engineering sign off. Extended coverage sidewalls not installed. 7/18/2003 2:03:02 PM
|
INSP-Supply line flush | 6/24/2003 | 6/25/2003 | 6/25/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/24/2003 at 4:00:39 PM. Contact: ###-####. not a flush; thrust block at base of riser okay; pictures of UG not developed yet 6/25/2003 2:19:25 PM
|
INSP-Supply line flush | 6/20/2003 | 6/23/2003 | 6/23/2003 | A | CANC |
Troy Cobbley
|
|
|
Debest will call when the thrust blocks are ready for inspection. Due to high water table pipe will be buried as it is installed and pictures will be taken and shown to the inspector before sign off 6/23/2003 2:25:25 PM
|
Telephone call | | | 5/30/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 5/30/2003 | | |
|
|
|
|
Plan assigned to (Bill) | 3/20/2003 | | 5/29/2003 | | DONE |
|
|
|
5/29/2003 13:05:12 JWA - activity updated through activity FIRA22 from case FIR03-00133.
|
Sprinkler Plan Check | 5/27/2003 | | 5/29/2003 | | PASS |
Bill Alexander
|
|
|
Possible recalculation required for slope exceeding 2" in 12" with condition of a attic wall?
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/29/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 5/29/2003 | | 5/29/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/29/2003 | | 5/29/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/27/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/20/2003 | | 4/16/2003 | | FAIL |
Bill Alexander
|
|
|
03/31/03 - Waiting for IBC and IFC reviews to be accomplished.
Plan review failed due to spacing coverage and lack of details to verify protection coverage.
|
Miscellaneous action | | | 4/16/2003 | | DONE |
|
|
|
Took plans to front desk for calling and returning.
|
Telephone call | | | 4/16/2003 | | DONE |
|
|
|
PLANS FAILED CALLLED TO LET DEBEST KNOW
|
Miscellaneous action | | | 3/31/2003 | | DONE |
|
|
|
Emailed Contractor that the IBC and IFC have not been completed and cannot do fire protection reviews until these have been accomplished.
|
Application received | | | 3/20/2003 | | |
|
|
|
|