INSP-Final Inspection | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | PASS |
Rick Jackson
|
|
|
We would like a final this PM. Please call prior to arrival.; Phone #: ###-#### Internet Inspection Request from: Trent Bice
|
INSP-Final Inspection | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | PASS |
Rick Jackson
|
|
|
We would like a final this PM. Please call prior to arrival.; Phone #: ###-#### Internet Inspection Request from: Trent Bice
|
DOC - Permit Finaled | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 2/24/2004 4:25:20 PM
|
DOC - Permit Finaled | 2/24/2004 | 2/24/2004 | 2/24/2004 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 2/24/2004 4:25:20 PM
|
INSP-Final Inspection | 2/19/2004 | 2/20/2004 | 2/20/2004 | A | FAIL |
Rick Jackson
|
|
|
Please call Mike prior to arrival; Phone #: ###-#### Internet Inspection Request from: Trent Bice need all trim completed 2/20/2004 4:27:08 PM
|
Plan assigned to (Bill) | 2/19/2004 | | 2/20/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/19/2004 | | 2/20/2004 | | PASS |
Bill Alexander
|
|
|
For corridor sprinkler modifications which have different K-factor than originally designed/verified.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/20/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/20/2004 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/20/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 2/19/2004 | | |
Bill Alexander
|
|
|
For corridor sprinkler modifications which have different K-factor than originally designed/verified.
|
INSP-Sprinkler Rough-in/Hydro | 2/10/2004 | 2/11/2004 | 2/11/2004 | A | PART |
Rick Jackson
|
|
|
hydro okay 2/11/2004 11:38:41 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/6/2004 | 2/10/2004 | 2/10/2004 | A | FAIL |
Rick Jackson
|
|
|
Scott Carter 5 of 6; Phone #: ###-#### Internet Inspection Request from: Trent Bice 2nd and 6th floors not holding pressure 2/10/2004 3:57:27 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/27/2003 | 10/28/2003 | 10/28/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/27/2003 at 1:41:39 PM. Contact: ###-####.S hydro on standpipe okay 10/28/2003 1:00:21 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2003 | 10/17/2003 | 10/17/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/16/2003 at 4:08:04 PM. Contact: ###-####. okay to cover 5-6 floors; firestopping needed at corridor; resubmit for concealed space under elevator machine room and plastic pipe instead of steel 10/17/2003 10:21:50 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/15/2003 | 10/16/2003 | 10/16/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/15/2003 at 12:56:35 PM. Contact: ###-####.Scheduled by a contractor via Hello! on 10/15/2003 at 12:55:42 PM. Contact: ###-####.Scheduled by a contractor via Hello! on 10/15/2003 at 12:54:45 PM. Contact: ###-####.Scheduled by a contractor via Hello! on 10/15/2003 at 12:53:42 PM. Contact: ###-####straps needed 628/609/room for construction elevator; elevator machine room requires SR heads - not QR 10/16/2003 4:03:20 PM 10/16/2003 4:04:22 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/14/2003 | 10/15/2003 | 10/15/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/14/2003 at 11:37:51 AM. Contact: ###-####. trash room needs strap 10/15/2003 11:11:24 AM
|
INSP-Sprinkler Rough-in/Hydro | 9/10/2003 | 9/11/2003 | 9/11/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/10/2003 at 8:36:47 AM. Contact: ###-####. okay to cover rooms; corridor requires firestopping; standpipes over 48 inches high 9/11/2003 12:34:08 PM
|
INSP-Sprinkler Rough-in | 9/4/2003 | 9/4/2003 | 9/4/2003 | A | PART |
Rick Jackson
|
|
|
okay to cover rooms; corridor pipe not restrained to prevent upward movement; fire stopping required in corridor 9/4/2003 8:57:49 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/29/2003 | 9/2/2003 | 9/2/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 11:37:39 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:36:25 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:31:17 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:29:53 AM. Contact: ###-####. Scheduled by a contractor via Hello! on 8/29/2003 at 11:40:27 AM. Contact: ###-####. corridor heads have too much vertical movement; rooms 304 and 302 need straps; 318 has excessive bend in pipe and may leak; 306 has head that is rotated 9/2/2003 3:39:04 PM
|
INSP-Sprinkler Rough-in | 8/27/2003 | 8/28/2003 | 8/28/2003 | A | PART |
Rick Jackson
|
|
|
pipe in corridors has excessive upward movement - need to restrain; rooms okay to cover on second floor only 8/28/2003 11:04:32 AM 8/28/2003 11:06:00 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/26/2003 | 8/27/2003 | 8/27/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/26/2003 at 10:27:05 AM. Contact: ###-####.
|
Issue and Print Permit | | | 8/26/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/31/2003 | | 8/7/2003 | | PASS |
Bill Alexander
|
|
|
Requires verification of basement parking garage standpipe interconnection of piping between PA2 and PA1.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 8/7/2003 | | 8/7/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/7/2003 | | 8/7/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/31/2003 | | |
Bill Alexander
|
|
|
|
FIR-Aging Inspection | 7/4/2003 | 7/4/2003 | 7/4/2003 | | PASS |
Rick Jackson
|
|
|
work is still in progress 7/7/2003 8:03:40 AM
|
Issue permit | | | 3/26/2003 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 3/21/2003 | | 3/25/2003 | | DONE |
|
|
|
3/25/2003 11:06:01 JWA - activity updated through activity FIRA22 from case FIR03-00138.
|
Sprinkler Plan Check | 3/12/2003 | | 3/25/2003 | | PART |
Bill Alexander
|
|
|
Elevator Mechanical Room #2 elevation in the calculations is the same as the 6th floor? Correct calculations to reflect actual elevation.
This facility is being designed with a Fire Booster Pump. Provide approval from the Fire Chief that a Class I-Dry-Manual Standpipe is acceptable in the structure above the basement-parking garage. Contact Dave Miller at ###-#### and obtain approval in writing of which shall be made a permanent part of this permit. (NFPA 14:3-1.1)
Provide details on the installation of piping and hose valves on each side of the wall adjacent to the exit openings of horizontal exits. (NFPA 14:6-1)
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/25/2003 | | DONE |
Bill Alexander
|
|
|
Resubmittal required
|
Inspection Record Card- Fire | 3/25/2003 | | 3/25/2003 | | DONE |
|
|
|
|
Telephone call | | | 3/25/2003 | | DONE |
|
|
|
permit ready
|
Application received | | | 3/21/2003 | | |
|
|
|
|