Permit Number | FIR03-00144 |
Status | Finaled |
Name |
MICRON TECHNOLOGY INC FP
|
Site Address |
8000 S FEDERAL WAY
|
Project Name | SPR Micron Building #26 |
Customer Number | |
ePlanReview | |
Description |
Micron Building #26 - To remove and reinstall 260 sprinklers for the conversion which includes the removal of a "coffered" to a Lay-In Grid ceiling, of approximately 30,000-ft/2, of the second floor office area of building #26 to a manufacturing area. This work is located between grid lines 11&15 and B&M. (There is also a small alteration at the first floor between grid lines 12&13 and B&C, which is NOT included in this fire permit, since it was not addressed herein). The fire sprinkler system work shall be installed in accordance to NFPA 13-1999, complying with the IFC-2000 and attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to garage shell permit: BLD03-00175.
|