INSP-Final Inspection | 8/26/2003 | 8/27/2003 | 8/27/2003 | A | FAIL |
Rick Jackson
|
|
|
julio; Phone #: ###-#### Internet Inspection Request from: Marc Lileks fire sprinkler control signs on doors; SFD not closing on third floor west; doors not latching in rated assemblies; emergency lights not on corridor lighting circuits; need hazardous chem sign on pool door; see fire alarm permit for fire alarm items; 8/27/2003 3:44:41 PM
|
INSP-Final Inspection | 8/27/2003 | 8/27/2003 | 8/27/2003 | P | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 8/27/2003 | 8/27/2003 | 8/27/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 8/27/2003 3:29:47 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/17/2003 | 8/18/2003 | 8/18/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/17/2003 at 10:06:30 PM. Contact: ###-####. hydro on wet system okay 8/18/2003 11:02:03 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/15/2003 | 8/15/2003 | 8/15/2003 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 8/15/2003 at 10:07:03 AM. Contact: ###-####. hydro on wet system dropped 4 psi 8/15/2003 2:28:31 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/23/2003 | 6/23/2003 | 6/23/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/23/2003 at 4:54:31 AM. Contact: ###-####. porte cachere from riser to canopy hydro okay 6/23/2003 1:48:23 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/17/2003 | 6/18/2003 | 6/18/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/17/2003 at 6:09:36 PM. Contact: ###-####. okay to cover hard lid areas on 2nd floor corridor; okay on hydro for first floor - will need to test when heads are installed 6/18/2003 10:36:04 AM
|
INSP-Sprinkler Rough-in/Hydro | 5/20/2003 | 5/21/2003 | 5/21/2003 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/20/2003 at 3:44:29 PM. Contact: ###-####. hydro okay for 2-3 floor rooms omly; corridor not completed 5/21/2003 3:51:51 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/19/2003 | 5/19/2003 | 5/19/2003 | A | PART |
Rick Jackson
|
|
|
hydro on dry system okay; will need detail for hangers on TJI's for the six inch main
|
CHANGE STATUS TO (ISS) | | | 5/19/2003 | | |
|
|
|
after resubmittal was paid for the permit was not put to the issue mode at that time///dld
|
Sprinkler Plan Check | 4/29/2003 | | 5/8/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 5/8/2003 | | 5/8/2003 | | DONE |
|
|
|
|
Telephone call | | | 5/8/2003 | | DONE |
|
|
|
permit ready
|
Plan resubmittals received | | | 4/28/2003 | | |
Bill Alexander
|
|
|
|
Issue permit | | | 4/18/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/4/2003 | | 4/4/2003 | | DONE |
|
|
|
|
Telephone call | | | 4/4/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (Bill) | 3/25/2003 | | 4/3/2003 | | DONE |
Bill Alexander
|
|
|
4/3/2003 15:21:28 JWA - activity updated through activity FIRA22 from case FIR03-00152.
|
Sprinkler Plan Check | 3/25/2003 | | 4/3/2003 | | PART |
Bill Alexander
|
|
|
Need some details on hangers, EQ bracing, fittings, recalc Porte Cochere.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/3/2003 | | DONE |
Bill Alexander
|
|
|
|
Application received | | | 3/25/2003 | | |
|
|
|
|