Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR03-00166
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 350 N MILWAUKEE ST Unit: 2180
Project NameSPR RAVE BTS - #2180
Customer Number 
ePlanReview 
Description
(RAVE)(BOISE TOWNE SQUARE-SPACE 2180) DEMO PERMIT ONLY - To demo fire sprinklers in preparation for a remodel of a 2,260-ft/2, retail space, for a new tenant located on the upper level of the BTS Mall. Fire sprinkler work is related to the removal of the overhead ceiling system fire sprinkler protection and readjusting for temporary protection at the roof/ceiling. Also related sprinkler work with the removal of an existing storage room. Fire sprinklers protection to tenant space during construction can be modified with deflector distances not meeting requirements of NFPA 13:1-4.6, A-1-4.6, temporarily during the construction phase if the following items are provided and verified.
1. Tenant is separated from the other tenants with a 1-hour fire rated tenant-demising wall,
2. Fuel loads of combustibles are kept to a minimum and removed daily,
3. Flammable liquids are not used or stored within the tenant space,
4. Tenants smoke detector is relocated to the roof/ceiling,
5. Zone smoke evacuation system and alarms are functioning properly.
The fire sprinkler system work shall be installed and maintained in accordance with minimum requirements of NFPA 13-1999, complying with the IFC-2000 and attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this permit, to provide witness of compliance verification of meeting minimum code. This permit is attached to building permit: BLD03-00342.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/15/20035/15/20035/15/2003PPASS
DetailsTroy Cobbley
DOC - Permit Finaled5/15/20035/15/20035/15/2003PPASS
DetailsTroy Cobbley
Finaled by inspector at 5/15/2003 3:27:11 PM
INSP-Conference4/21/20034/21/20034/21/2003ADONE
DetailsTroy Cobbley
I spoke with Joe Hudson 623-412-899 or ###-#### on Friday 4/18/2003 and told him that not all of the conditions of the sprinkler demo permit had been met. These items are the smoke detector at the entrance is hanging down at the original ceiling level wrapped in plastic and no has provided verification that the smoke control system is operational. The demo permit paper work was not available at the project site. I told Joe that if items had not been taken care of by monday I would need to red tag the project.
I had tried to contact Treasure Valley Fire but did not receive a call back on Friday.
I called Treasure Valley Fire today, monday, and spoke to Brodie and explained the problems to him. He said he would get with George
Plan assigned to (Bill)4/9/2003 4/9/2003 DONE
4/9/2003 13:20:44 JWA - activity updated through activity FIRA22 from case FIR03-00166.
Miscellaneous action  4/9/2003 DONE
Recieved and responded to (email) contact from Dave Miller concerning my opinion with T.V. installing temporary protection (while under construction) that will be out of code compliance. Waiting his reply - 9:00 am.
Sprinkler Plan Check4/8/2003 4/9/2003 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  4/9/2003 DONE
DetailsBill Alexander
Inspection Record Card- Fire4/9/2003 4/9/2003 DONE
Telephone call  4/9/2003 DONE
left mess that permit is ready
Issue permit  4/9/2003 DONE
Application received  4/8/2003  
Faxed