FIR-Aging Inspection | 7/4/2005 | 7/4/2005 | 7/7/2005 | | PASS |
Troy Cobbley
|
|
|
|
INSP-Final Inspection | 7/7/2005 | 7/7/2005 | 7/7/2005 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 8/27/2003 | 8/28/2003 | 8/28/2003 | A | FAIL |
Troy Cobbley
|
|
|
replace bent sprinkler pendants, replace painted sprinkler pendants, remove tape from pendants, provide rated access panel for inspectors test valve 8/28/2003 3:59:52 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/23/2003 | 6/23/2003 | 6/23/2003 | P | FAIL |
Troy Cobbley
|
|
|
hydro test failed due to leaking fitting on the wet system 6/23/2003 3:31:45 PM
|
INSP-Sprinkler Rough-in/Hydro | 6/23/2003 | 6/23/2003 | 6/23/2003 | A | PART |
Troy Cobbley
|
|
|
started the 24 hour air test on the dry system. Started at 11:00am with 44 lbs
|
Inspection Record Card- Fire | 6/19/2003 | | 6/19/2003 | | DONE |
|
|
|
|
Telephone call | | | 6/19/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 6/19/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/18/2003 | | 6/18/2003 | | PASS |
Bill Alexander
|
|
|
Field change in remote area piping - inspector requested verification.
|
Plan resubmittals received | | | 6/18/2003 | | DONE |
|
|
|
Field change in remote area piping - inspector requested verification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2003 | | DONE |
Bill Alexander
|
|
|
|
Issue permit | | | 5/27/2003 | | |
|
|
|
|
INSP-Sprinkler Rough-in | 5/23/2003 | 5/23/2003 | 5/23/2003 | P | FAIL |
Troy Cobbley
|
|
|
###-#### john No approved plans on site. No inspection done 5/23/2003 3:39:43 PM
|
Telephone call | | | 5/22/2003 | | DONE |
|
|
|
CALLED 5-22-03
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/21/2003 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 5/14/2003 | | 5/21/2003 | | PASS |
Bill Alexander
|
|
|
Reverfication of caculation problems for Area "A" and "B".
|
Plan resubmittals received | | | 5/14/2003 | | |
Bill Alexander
|
|
|
Reverfication of caculation problems for Area "A" and "B".
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/12/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 5/12/2003 | | 5/12/2003 | | DONE |
|
|
|
|
Telephone call | | | 5/12/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
CHANGE STATUS TO (ISS) | | | 5/12/2003 | | DONE |
|
|
|
ALREADY ISSUED
|
INSP-Sprinkler Rough-in | 5/9/2003 | 5/9/2003 | 5/9/2003 | P | FAIL |
Troy Cobbley
|
|
|
Provide insulation on cpvc piping at north end of building 5/9/2003 4:22:20 PM
|
Sprinkler Plan Check | 5/2/2003 | | 5/9/2003 | | PART |
Bill Alexander
|
|
|
Calculation verification for Attic (Area "A" and "B" test).
|
Plan resubmittals received | | | 5/2/2003 | | |
Bill Alexander
|
|
|
|
Plan assigned to (Bill) | 4/11/2003 | | 4/24/2003 | | DONE |
|
|
|
4/24/2003 08:53:02 JWA - activity updated through activity FIRA22 from case FIR03-00176.
|
Sprinkler Plan Check | 4/11/2003 | | 4/24/2003 | | PART |
Bill Alexander
|
|
|
Work may start. Requires resubmittal for some code issues and verification.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 4/24/2003 | | 4/24/2003 | | DONE |
|
|
|
|
Telephone call | | | 4/24/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Application received | | | 4/11/2003 | | |
|
|
|
|