INSP-Conference | 7/17/2003 | 7/18/2003 | 7/18/2003 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 4:47:00 PM. Contact: ###-####.
|
INSP-Final Inspection | 7/17/2003 | 7/18/2003 | 7/18/2003 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 4:47:44 PM. Contact: ###-####.
|
DOC - Permit Finaled | 7/18/2003 | 7/18/2003 | 7/18/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 7/18/2003 5:15:09 PM
|
INSP-Final Inspection | 7/17/2003 | 7/18/2003 | 7/17/2003 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 4:05:45 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 17 2003 4:46PM.
|
INSP-Conference | 7/17/2003 | 7/18/2003 | 7/17/2003 | P | CANC |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 4:04:53 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 17 2003 4:45PM.
|
INSP-Sprinkler Rough-in/Hydro | 7/16/2003 | 7/17/2003 | 7/17/2003 | A | PART |
Troy Cobbley
|
|
|
above ground hydro test is ok. Need test papers. Forward flow flush test is OK. Rough-in for office area is OK except for the combustible concealed spaced created by the mechanical mezzanine. Upright sprinkler heads will need to be added. All shop areas need looked at. 7/17/2003 4:10:51 PM
|
INSP-Sprinkler Rough-in | 7/16/2003 | 7/16/2003 | 7/16/2003 | P | FAIL |
Rick Jackson
|
|
|
performed a walk through while doing the UG flush; need approved plans; heads obstructed by soffit in main lobby/counter; heads taped in west bay throughout 7/16/2003 12:56:58 PM
|
Sprinkler Plan Check | 5/2/2003 | | 5/15/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/15/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 5/15/2003 | | 5/15/2003 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/15/2003 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/15/2003 | | DONE |
|
|
|
ALREADY ISSUED
|
Plan resubmittals received | | | 5/2/2003 | | |
|
|
|
Resubmittal review of previous denied spray booth, mixing room, etc.
|
Issue permit | | | 4/30/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/29/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 4/29/2003 | | 4/29/2003 | | DONE |
|
|
|
|
Telephone call | | | 4/29/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (Bill) | 4/17/2003 | | 4/28/2003 | | DONE |
|
|
|
4/28/2003 15:44:52 JWA - activity updated through activity FIRA22 from case FIR03-00186.
|
Sprinkler Plan Check | 4/17/2003 | | 4/28/2003 | | PART |
Bill Alexander
|
|
|
Requires resubmittal addressing code issues.
|
Application received | | | 4/17/2003 | | |
|
|
|
|