Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR03-00194
StatusFinaled
Name COMMERCIAL FIRE PROTECTION
Site Address 472 N MORNINGSIDE WAY
Project NameSPR GADDIS RESIDENCE
Customer Number 
ePlanReview 
Description
(HIGHLANDER HOMES) (GADDIS RESIDENCE) * To construct a 2144-ft/2 one story single family dwelling with a 957-ft/2 finished basement, a 698-ft/2 attached three-car garage. This lot is within a hillside area and is subject to the hillside ordinances. This structure shall be fitted with a 13D fire sprinkler system, which includes a fire sprinkler barrier protection between garage and dwelling areas, per Boise City Ordinance. The fire sprinkler flow alarm shall be interconnected to the required residence smoke detection system. All fire sprinkler work and related, which includes dual service water supply, the system backflow prevention device (provided by others), shall be per NFPA 13D, approved plans, engineering/red-lining and attached review comments, under direction of the Fire Chief. This permit is attached to: BLD02-02604. (Lot 89, Block 1, Morningside Heights Subdivision)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/23/20039/23/20039/23/2003PPASS
DetailsRick Jackson
clone final thanks rick
DOC - Permit Finaled9/23/20039/23/20039/23/2003PPASS
DetailsRick Jackson
Finaled by inspector at 9/23/2003 4:08:12 PM
INSP-Final Inspection9/19/20039/22/20039/22/2003AFAIL
DetailsRick Jackson
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need CPVC piping installed per listing in unfinished areas or cover with sheetrock on ceiling 9/22/2003 11:50:20 AM
INSP-Final Inspection9/19/20039/19/20039/19/2003AFAIL
DetailsTroy Cobbley
I stopped at project by accident. The general contractor requested a final inspection since I was there. I could not because the fire sprinker system was not complete. I pointed out several deficiencies
INSP-Sprinkler Rough-in/Hydro6/13/20036/13/20036/13/2003PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/13/2003 at 10:28:02 AM. Contact: ###-####. okay to cover; need 2 inch meter installed; riser to have drain/inspectors test to drain or outside; need coverage under stairs; need proper type heads and will verify at final 6/13/2003 3:34:39 PM
Issue permit  5/1/2003  
Plan assigned to (Bill)4/21/2003 4/30/2003 DONE
4/30/2003 15:41:12 JWA - activity updated through activity FIRA22 from case FIR03-00194.
Sprinkler Plan Check4/21/2003 4/30/2003 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  4/30/2003 DONE
DetailsBill Alexander
Inspection Record Card- Fire4/30/2003 4/30/2003 DONE
Telephone call  4/30/2003 DONE
permit ready and fees due
Application received  4/21/2003