INSP-Final Inspection | 9/23/2003 | 9/23/2003 | 9/23/2003 | P | PASS |
Rick Jackson
|
|
|
clone final thanks rick
|
DOC - Permit Finaled | 9/23/2003 | 9/23/2003 | 9/23/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 9/23/2003 4:08:12 PM
|
INSP-Final Inspection | 9/19/2003 | 9/22/2003 | 9/22/2003 | A | FAIL |
Rick Jackson
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need CPVC piping installed per listing in unfinished areas or cover with sheetrock on ceiling 9/22/2003 11:50:20 AM
|
INSP-Final Inspection | 9/19/2003 | 9/19/2003 | 9/19/2003 | A | FAIL |
Troy Cobbley
|
|
|
I stopped at project by accident. The general contractor requested a final inspection since I was there. I could not because the fire sprinker system was not complete. I pointed out several deficiencies
|
INSP-Sprinkler Rough-in/Hydro | 6/13/2003 | 6/13/2003 | 6/13/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 6/13/2003 at 10:28:02 AM. Contact: ###-####. okay to cover; need 2 inch meter installed; riser to have drain/inspectors test to drain or outside; need coverage under stairs; need proper type heads and will verify at final 6/13/2003 3:34:39 PM
|
Issue permit | | | 5/1/2003 | | |
|
|
|
|
Plan assigned to (Bill) | 4/21/2003 | | 4/30/2003 | | DONE |
|
|
|
4/30/2003 15:41:12 JWA - activity updated through activity FIRA22 from case FIR03-00194.
|
Sprinkler Plan Check | 4/21/2003 | | 4/30/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/30/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 4/30/2003 | | 4/30/2003 | | DONE |
|
|
|
|
Telephone call | | | 4/30/2003 | | DONE |
|
|
|
permit ready and fees due
|
Application received | | | 4/21/2003 | | |
|
|
|
|