INSP-Final Inspection | 12/10/2003 | 12/11/2003 | 12/11/2003 | P | PASS |
Rick Jackson
|
|
|
Wes; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
DOC - Permit Finaled | 12/11/2003 | 12/11/2003 | 12/11/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 12/11/2003 2:59:44 PM
|
INSP-Alarm Testing | 11/19/2003 | 11/20/2003 | 11/20/2003 | A | FAIL |
Rick Jackson
|
|
|
Wes; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes need 177cd strobe in ADA room as the strobe is within 24 inches of ceiling; need lockout on FACP circuit breaker; need map; need sign on fire alarm panel cosmetic door; need to test sprinkler flow; all other alarm items have been tested 11/20/2003 11:23:02 AM
|
FIR-Aging Inspection | 9/18/2003 | 9/18/2003 | 9/18/2003 | | NR |
Troy Cobbley
|
|
|
I spoke to stephanie with Peak Alarm and she stated she would follow up with the status of the project 9/18/2003 10:59:44 AM
|
Issue permit | | | 6/19/2003 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 5/28/2003 | | 6/18/2003 | | DONE |
|
|
|
6/18/2003 08:54:11 M_F - activity updated through activity FIRA22 from case FIR03-00263.
|
Alarm Plan Check | | | 6/18/2003 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/18/2003 | | 6/18/2003 | | DONE |
|
|
|
|
Telephone call | | | 6/18/2003 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Plan resubmittals received | | | 6/12/2003 | | DONE |
|
|
|
|
Alarm Plan Check | | | 6/10/2003 | | FAIL |
|
|
|
Resubmittal required. Comments faxed to Steve Larsen 6/10/2003.
|
Telephone call | | | 6/9/2003 | | |
|
|
|
Steve Larsen called and stated that the design was correct and to have it reviewed. He faxed over a letter from Roger W. Gehrke at Idaho Department of Health & Welfare that basically states that smoke detectors in the residents rooms shall be "system" detectors.
|
Telephone call | | | 6/3/2003 | | |
|
|
|
Steve Larsen designed to IFC, the building permit was issued under UBC. The building permit is for R-3, Steve states that is should be R-4, S-2 with controlled egress. At this time his first submittal is on "hold" in Sam's cubicle. He will either call to have it reviewed, or resubmit.
|
Application received | | | 5/28/2003 | | |
|
|
|
|