Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR03-00296
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 101 S CAPITOL BLVD Unit: 601
Project NameSPR AHRENS & DeANGELI-6TH FL
Customer Number 
ePlanReview 
Description
(AHRENS AND DeANGELI - 6TH FLOOR) To add and modify fire sprinklers in a 2,683-ft/2 office tenant space for interior improvements. This space is located on the 6th floor (14,600-ft/2) of an existing high-rise building. Work is related to interior nonbearing walls and suspended ceilings with restroom upgrades. This building is fire sprinklered because it is a high-rise. All fire sprinklers and related appurtenance within this permit work scope shall meet current NFPA 13-1999 standards, comply with the IFC-2000 and attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, in order to provide witness verification of compliance in meeting minimum code standards. This permit is attached to building permit: BLD03-00436. Any work associated with the existing elevator lobby/corridor shall comply with the 1-hr corridor provisions of the 2000 IBC.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/24/20037/25/20037/25/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 7/24/2003 at 9:39:44 AM. Contact: ###-####.
DOC - Permit Finaled7/25/20037/25/20037/25/2003PPASS
DetailsRick Jackson
Finaled by inspector at 7/25/2003 3:17:35 PM
INSP-Sprinkler Rough-in/Hydro7/14/20037/14/20037/14/2003PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 7/14/2003 at 9:54:18 AM. Contact: ###-####. Ahrens is okay to cover; still need to strap down two heads in hallway; lobby completed; this permit covers the entire floor 7/14/2003 2:51:40 PM
Telephone call  7/10/2003 DONE
7/10/03 - Called Tom Easton regaring a resubmittal for replacing all existing steel piped drops on this floor to Flex Head drops, plus more misc. reloations and adding of sprinklers. Requrested he submit this work as a new permit with a new permit application.
INSP-Sprinkler Rough-in/Hydro6/13/20036/16/20036/16/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 6/13/2003 at 2:50:21 PM. Contact: ###-####. okay to cover arched area in elevator lobby; the rest of the lobby to be completed later per Mick; the rest of the permitted area isn't ready or complete 6/16/2003 9:49:39 AM
Issue permit  6/11/2003 DONE
Plan assigned to (Bill)6/2/2003 6/10/2003 DONE
6/10/2003 15:30:13 JWA - activity updated through activity FIRA22 from case FIR03-00296.
Sprinkler Plan Check6/9/2003 6/10/2003 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  6/10/2003 DONE
DetailsBill Alexander
Inspection Record Card- Fire6/10/2003 6/10/2003 DONE
Telephone call  6/10/2003 DONE
permit ready and fees due
Plan resubmittals received  6/9/2003 DONE
DetailsBill Alexander
Sprinkler Plan Check6/2/2003 6/4/2003 FAIL
DetailsBill Alexander
Elevator Lobby needs corrected coverage.
Miscellaneous action  6/4/2003 DONE
Took plans to front desk for returning and emailed copy of failed review to designer.
Application received  6/2/2003