Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR03-00315
StatusFinaled
Name ALLIED GENERAL FIRE & SECURITY
Site Address 670 S JULIA DAVIS DR
Project Namealm - Boise Art Museum
Customer NumberSEE COMMENTS
ePlanReview 
Description
Upgrade of fire alarm panel and system. Sprinkler monitoring, non-required automatic detection, audible/visual annunciation to a remote station.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary  7/21/2004 DONE
INSP-Final Inspection6/9/20046/14/20046/14/2004APASS
DetailsRick Jackson
clifford; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled6/14/20046/14/20046/14/2004APASS
DetailsRick Jackson
Finaled by inspector at 6/14/2004 10:15:04 AM
INSP-Final Inspection5/25/20045/28/20045/28/2004AFAIL
DetailsRick Jackson
CLIFFORD; Phone #: ###-#### Internet Inspection Request from: Annette Moore On fire alarm NAC panel #1 circuits 1-2 develpoe a trouble condition that won't clear without powering down panel 5/28/2004 9:54:15 AM
INSP-Final Inspection5/18/20045/24/20045/24/2004AFAIL
DetailsRick Jackson
Clifford; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Trouble on NAC-1 circuit - 2; descriptor for NAC/EVAC trouble modules; water flow restores alarm when flow stops 5/24/2004 10:32:22 AM
Issue permit  4/13/2004 DONE
Alarm Plan Check3/12/2004 3/31/2004 PASS
DetailsTroy Cobbley
Plan modifications approved
PLANS/APPL TAKEN TO FRONT DESK  3/31/2004 DONE
DetailsTroy Cobbley
Permit Ready to Issue  3/31/2004  
Telephone call  3/31/2004 DONE
left mess for ken webster that permit is ready
Inspection Record Card- Fire3/31/2004 3/31/2004 DONE
INSP-Conference3/22/20043/22/20043/22/2004ADONE
DetailsTroy Cobbley
I called to speak to Cliff but was only able to leave a message. I need description on what the scope of work is since this project was just issued.
Plan resubmittals received  3/12/2004 DONE
INSP-Final Inspection2/24/20043/1/20043/1/2004AFAIL
DetailsRick Jackson
cliff-- ###-#### need resubmittals as there are two SNAC panels instead of one - 4 NAC are one SNAC and NAC 7-8 are on the other; batteries on SNAC aren't supervised; speakers are T-tapped; need maps; spot checked several smokes but need to test for alarm; need to check FACP for troubles; strobe to be 95 cd instead of 75 in SW gallery (see plans); need to test smokes for alarms and tampers plus manaul pulls and duct detectors; detectors 52 -and 53 are actually 72 and 74 - update maps/plans(didn't show up on address list either 3/1/2004 6:09:07 PM
INSP-Final Inspection2/23/20042/24/20042/24/2004ANR
DetailsRick Jackson
CLIFF; Phone #: ###-#### Internet Inspection Request from: Darla Downs rescheduled for 34/1/04 2/24/2004 8:41:10 AM
Issue and Print Permit  2/10/2004 DONE
Inspection Record Card- Fire2/10/2004 2/10/2004 DONE
Alarm Plan Check2/9/2004 2/9/2004 PASS
Details
Plan modifications approved with comments
PLANS/APPL TAKEN TO FRONT DESK  2/9/2004 DONE
Details
Permit Ready to Issue  2/9/2004  
Telephone call  2/9/2004 DONE
spoke with Ken -- permit is ready.
Plan resubmittals received  1/27/2004 DONE
INSP-Final Inspection8/5/20038/6/20038/6/2003ACANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/5/2003 at 9:53:09 AM. Contact: ###-####. this permit was called in by mistake by another contractor 8/6/2003 9:52:32 AM
INSP-Final Inspection8/6/20038/6/20038/6/2003PCANC
DetailsRick Jackson
wrong permit added by inspector 409 8/6/2003 11:06:51 AM
Issue and Print Permit  7/11/2003 DONE
Plan assigned to (SAM)6/13/2003 7/1/2003 DONE
7/1/2003 11:33:37 M_F - activity updated through activity FIRA22 from case FIR03-00315.
Alarm Plan Check  7/1/2003 PASS
Approved pending field inspection of fire alarm permit comments.

PLANS/APPL TAKEN TO FRONT DESK  7/1/2003 DONE
Inspection Record Card- Fire7/1/2003 7/1/2003 DONE
Telephone call  7/1/2003 DONE
permit ready
Plan resubmittals received  6/27/2003 DONE
Telephone call  6/23/2003  
Called to inquire about existing drawings. Ken Webster stated there weren't any to give for interim detector spacing, that basically we would not have any less coverage than we have now. He stated that Dave Miller agreed to a 36 month overhaul, he will get the letter and fax it to me.
Alarm Plan Check  6/23/2003 FAIL
Resubmittal required. Comments faxed to Kevin Webster 6/24/2003.
Application received  6/13/2003