Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR03-00336
StatusFinaled
Name IDAHO FIRE PROTECTION
Site Address 550 S BROADWAY AVE Unit: 120
Project NameSPR RAM BLDG #100-BOISE BAGEL
Customer Number 
ePlanReview 
Description
(BOISE BAGEL CAFE)(RAM BLDG #100-STE 120) To modify a (vacant) shell system for a new 1,557-ft/2 space with an assembly restaurant tenant. Fire sprinkler work is related to the installation of new interior walls, two new restrooms, new suspended ceiling, new walk-in cooler/freezer, new Type II hood over oven, new mechanical work. All three buildings on this site were reviewed as one building, for allowable area and exterior wall and opening protection under the shell-building permit, 1997 UBC. This building is fully fire sprinklered for area increase. All fire sprinklers and related appurtenance within this permit work scope shall meet current NFPA 13-1999 standards, comply with the IFC-2000 and attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, in order to provide witness verification of compliance in meeting minimum code standards. This permit is attached to building permit: BLD03-00900.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/5/20038/6/20038/6/2003APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/5/2003 at 7:05:58 PM. Contact: ###-####.
DOC - Permit Finaled8/6/20038/6/20038/6/2003APASS
DetailsRick Jackson
Finaled by inspector at 8/6/2003 8:18:26 AM
INSP-Sprinkler Rough-in/Hydro7/31/20037/31/20037/31/2003AFAIL
DetailsTroy Cobbley
Provide a high temp. sprinkler pendant in the hood, provide retainign straps where shown on plans, provide hangers where shown on plans, provide intermediate temp head in the mens restroom, provide dry pendant in cooler. I told the contractor that it was ok to install ceiling tile but a ladder and a person would be required to be present at the final inspection to remove ceiling tile to verify completion of the above items. 7/31/2003 10:45:29 AM
Issue permit  7/14/2003  
Sprinkler Plan Check6/25/2003 6/26/2003 PASS
DetailsBill Alexander
Plan assigned to (Bill)6/25/2003 6/26/2003  
PLANS/APPL TAKEN TO FRONT DESK  6/26/2003 DONE
DetailsBill Alexander
Inspection Record Card- Fire6/26/2003 6/26/2003 DONE
Telephone call  6/26/2003 DONE
permit ready
Application received  6/25/2003