Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberFIR03-00347
StatusFinaled
Name DE BEST FIRE PROTECTION
Site Address 1500 E WRIGHT ST
Project NameSPR OUR LADY OF THE ROSARY
Customer Number 
ePlanReview 
Description
Our Lady of the Rosary (Building Addition) - To add approximately 11,368-ft/2 of existing dry system and new floor area to the existing parish hall. Work to include remodeling of the existing facility, install new kitchen area, add exterior patio cover and storage building. All work is on the north side of the area separation wall. All construction per the approved plans and attached comment list. This building is fully fire sprinklered for area increase. All fire sprinkler system work shall be in accordance to NFPA 13-1999, complying with the IFC-2000 and attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to Building Permit: BLD02-2919.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/12/200312/12/200312/12/2003PPASS
DetailsRick Jackson
DOC - Permit Finaled12/12/200312/12/200312/12/2003PPASS
DetailsRick Jackson
Finaled by inspector at 12/12/2003 4:18:00 PM
INSP-Final Inspection12/10/200312/10/200312/10/2003AFAIL
DetailsRick Jackson
escutcheons needed/remove tape on heads; need signage on drains; need hanger on pipe in mechanical room 12/10/2003 11:23:21 AM
INSP-Sprinkler Rough-in/Hydro12/8/200312/8/200312/8/2003PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/8/2003 at 7:42:59 AM. hydro on new system okay; will need drain signage; need hanger on branch line in mechanical near kitchen; tie-in not complete and will verify at final;need escutcheons 12/8/2003 4:19:50 PM
INSP-Sprinkler Rough-in/Hydro12/1/200312/2/200312/2/2003ANR
DetailsRick Jackson
never received call from Moke that the hydro test was ready 12/3/2003 1:40:34 PM
INSP-Sprinkler Rough-in/Hydro12/1/200312/1/200312/1/2003PNR
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/1/2003 at 11:00:54 AM. Contact: ###-####. rescheduled for 12/2/03 12/1/2003 4:04:11 PM
INSP-Sprinkler Rough-in/Hydro11/6/200311/7/200311/7/2003APART
DetailsRick Jackson
11 am - air test end - 49 psi air test okay; need head in closet by entryway; tenting in progress for return bend and will be completed before insulating 11/7/2003 1:59:04 PM
INSP-Sprinkler Rough-in/Hydro11/5/200311/6/200311/6/2003APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/5/2003 at 3:20:54 PM. Contact: ###-####. start air test 49 psi at 11 am 11/6/2003 12:33:57 PM
INSP-Sprinkler Rough-in/Hydro10/23/200310/24/200310/24/2003PFAIL
DetailsRick Jackson
stop air test stopped by the job site to talk to the GC and checked the gauge - is at 22 psi. 10/24/2003 10:34:02 AM
INSP-Sprinkler Rough-in/Hydro10/23/200310/23/200310/23/2003PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 10/23/2003 at 9:41:19 AM. start air test at 42 psi 10/23/2003 3:40:54 PM
INSP-Sprinkler Rough-in/Hydro9/19/20039/19/20039/19/2003PCANC
DetailsTroy Cobbley
Inspection was for 24 hour air test for the dry pipe system. Contractor wanted a witness for the finish of the test. I told them someone needed to witness the start of the test. They will do it over starting monday 9/19/2003 4:17:34 PM
INSP-Sprinkler Rough-in9/11/20039/12/20039/12/2003PPART
DetailsRick Jackson
checked status of tenting and nothing has changed since yesterday 9/12/2003 3:22:10 PM
INSP-Sprinkler Rough-in/Hydro9/11/20039/11/20039/11/2003PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/11/2003 at 8:45:47 AM. Contact: ###-####. tenting has started and the areas started are going good; middle area of south side okay for rough-in 9/11/2003 2:25:24 PM
INSP-Sprinkler Rough-in/Hydro9/8/20039/8/20039/8/2003PPART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/8/2003 at 9:30:32 AM. Contact: ###-####. okay to cover northwest side of new addition 9/8/2003 4:06:24 PM
INSP-Sprinkler Rough-in9/4/20039/5/20039/5/2003PFAIL
DetailsRick Jackson
ross; Phone #: ###-#### Internet Inspection Request from: Barbara Moore attic heads overspaced in classrooms; attic heads not 16-22 inches drom ridge; deflector on hip heads turned the wrong way; sprigs not supported; attic area not protected in north side room; heads within 6 ft in rooms with moveable partitions; return bends not used in all areas; area under stairs and under stage require sprinkler protection; FDC obstrcuted by bushes; not approved for cover 9/5/2003 4:23:11 PM
Issue and Print Permit  8/13/2003 DONE
Plan assigned to (Bill)7/25/2003 8/12/2003 DONE
DetailsBill Alexander
8/12/2003 15:12:08 JWA - activity updated through activity FIRA22 from case FIR03-00347.
Sprinkler Plan Check8/8/2003 8/12/2003 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  8/12/2003 DONE
DetailsBill Alexander
Inspection Record Card- Fire8/12/2003 8/12/2003 DONE
Telephone call  8/12/2003 DONE
PERMIT READY AND FEES DUE
Telephone call  8/12/2003 DONE
spoke with alicia and told permit is ready & fees
Plan resubmittals received  8/5/2003 DONE
Sprinkler Plan Check7/25/2003 7/31/2003 FAIL
DetailsBill Alexander
Many issues not addressed correctly or sufficiently.
Miscellaneous action  7/31/2003 DONE
Took plans/submittals to be returned and corrections provided.
Plan resubmittals received  7/25/2003  
Issue permit  7/17/2003  
Inspection Record Card- Fire7/16/2003 7/16/2003 DONE
Telephone call  7/16/2003 DONE
left mess that permit is ready
Sprinkler Plan Check7/1/2003 7/15/2003 PART
DetailsBill Alexander
Requires corrections and reaubmittals. Refer to attached notes.
PLANS/APPL TAKEN TO FRONT DESK  7/15/2003 DONE
DetailsBill Alexander
Plan assigned to (Bill)7/10/2003 7/10/2003 DONE
Telephone call  7/10/2003 DONE
DetailsBill Alexander
Called designer and asked for his assistance (come in) to interpret the plans he submitted. Said he will be down this AM.
Application received  7/1/2003