INSP-Final Inspection | 9/29/2003 | 9/30/2003 | 9/30/2003 | A | PASS |
Troy Cobbley
|
|
|
Scheduled by a contractor via Hello! on 9/29/2003 at 12:16:46 PM. Contact: ###-####.
|
DOC - Permit Finaled | 9/30/2003 | 9/30/2003 | 9/30/2003 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 9/30/2003 12:02:27 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/15/2003 | 9/16/2003 | 9/16/2003 | A | PART |
Rick Jackson
|
|
|
hydro on wet system okay; no rough-in inspection accomplished 9/17/2003 2:19:49 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/15/2003 | 9/15/2003 | 9/15/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/15/2003 at 9:44:35 AM. Contact: ###-####. rescheduled 9/15/2003 2:03:40 PM
|
INSP-Supply line flush | 9/4/2003 | 9/5/2003 | 9/5/2003 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/4/2003 at 2:38:49 PM. Contact: ###-####. wrong permit called in -see FIR03-00289 for flush 9/5/2003 9:41:15 AM
|
INSP-Sprinkler Rough-in/Hydro | 8/3/2003 | 8/4/2003 | 8/4/2003 | A | PART |
Troy Cobbley
|
|
|
Dry system hydro test is ok 8/4/2003 11:24:20 AM
|
INSP-Sprinkler Rough-in | 8/4/2003 | 8/4/2003 | 8/4/2003 | P | PART |
Troy Cobbley
|
|
|
rough-in inspection for the dry pipe system is ok and can be covered. 8/4/2003 4:06:10 PM
|
Plan assigned to (Bill) | 7/8/2003 | | 7/25/2003 | | DONE |
Bill Alexander
|
|
|
7/25/2003 12:38:20 JWA - activity updated through activity FIRA22 from case FIR03-00369.
|
Sprinkler Plan Check | 7/18/2003 | | 7/25/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/25/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 7/25/2003 | | 7/25/2003 | | DONE |
|
|
|
|
Issue permit | | | 7/25/2003 | | |
|
|
|
|
Telephone call | | | 7/22/2003 | | DONE |
|
|
|
tom dutkus was here to pick up other plans and gave him these failed plans at the same time
|
Plan resubmittals received | | | 7/18/2003 | | |
|
|
|
|
Sprinkler Plan Check | 7/8/2003 | | 7/17/2003 | | FAIL |
Bill Alexander
|
|
|
|
Miscellaneous action | | | 7/17/2003 | | DONE |
|
|
|
Took failed plans to front desk for calling and returning for corrections.
|
Application received | | | 7/8/2003 | | |
|
|
|
|