INSP-Final Inspection | 11/17/2003 | 11/17/2003 | 11/17/2003 | P | PASS |
Troy Cobbley
|
|
|
|
DOC - Permit Finaled | 11/17/2003 | 11/17/2003 | 11/17/2003 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 11/17/2003 2:47:04 PM
|
INSP-Sprinkler Rough-in/Hydro | 10/2/2003 | 10/3/2003 | 10/3/2003 | P | PART |
Rick Jackson
|
|
|
harry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore hydro on overhead okay; forward flow of the BFP okay; need spare heads for new drops; complete heads for drops; lock and chain for wall PIV; remove tape from heads in all areas being painted 10/3/2003 3:44:01 PM
|
INSP-Sprinkler Rough-in/Hydro | 9/30/2003 | 10/1/2003 | 10/1/2003 | A | NR |
Rick Jackson
|
|
|
harry; Phone #: ###-#### Internet Inspection Request from: Darla Downs per Troy they will need resubmittals for the sprinkler system 10/1/2003 1:12:01 PM
|
INSP-Sprinkler Rough-in/Hydro | 8/19/2003 | 8/20/2003 | 8/20/2003 | A | FAIL |
Troy Cobbley
|
|
|
###-#### harry Sprinkler rough-in failed. See approved plans for locations and items. Issues included hanging insulation, sprinklers overspaced, hangers on bottom chords of trusses. The undergroud supply piping is ok to cover. The hydro test is ok 8/20/2003 10:43:21 AM
|
Override - Parcel Holds | | | 8/19/2003 | | |
|
|
|
|
Issue permit | | | 7/23/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 7/22/2003 | | 7/22/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/22/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 7/22/2003 | | 7/22/2003 | | DONE |
|
|
|
|
Telephone call | | | 7/22/2003 | | DONE |
|
|
|
permit ready and fees due
|
Application received | | | 7/21/2003 | | |
|
|
|
|