| INSP-Final Inspection | 12/15/2003 | 12/15/2003 | 12/15/2003 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/15/2003 at 10:18:09 AM.
|
| DOC - Permit Finaled | 12/15/2003 | 12/15/2003 | 12/15/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 12/15/2003 2:16:51 PM
|
| Issue and Print Permit | | | 12/10/2003 | | DONE |
|
|
|
|
| Inspection Record Card- Fire | 12/10/2003 | | 12/10/2003 | | DONE |
|
|
|
|
| Permit Ready to Issue | | | 12/10/2003 | | DONE |
|
|
|
|
| Telephone call | | | 12/10/2003 | | DONE |
|
|
|
Spoke with John and told him permit is ready & fees
|
| INSP-Final Inspection | 12/8/2003 | 12/9/2003 | 12/9/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/8/2003 at 3:16:35 PM. need remote area in restrooms recalc'd as additional heads are not shown on plans 12/9/2003 10:24:41 AM
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 12/9/2003 | | DONE |
Bill Alexander
|
|
|
|
| Plan assigned to (Bill) | 12/9/2003 | | 12/9/2003 | | DONE |
|
|
|
|
| Sprinkler Plan Check | 12/9/2003 | | 12/9/2003 | | PASS |
Bill Alexander
|
|
|
Plan/filed changes, corrections. Added sprinkler head in remote Area #2. Calced area is not
|
| Plan resubmittals received | | | 12/9/2003 | | DONE |
|
|
|
|
| INSP-Sprinkler Rough-in/Hydro | 12/5/2003 | 12/8/2003 | 12/8/2003 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/5/2003 at 4:18:05 PM. will need the remote area (restrooms) recalc'd per Bill Alexander as there are more heads than shown on plans; provide as-builts for the changes made to DJ area and restrooms; add head gaurds for heads under stairs; heads obstructed/overspaced by ductwork at new bar on first floor under another FIR permit 12/8/2003 10:13:01 AM
|
| Issue and Print Permit | | | 9/23/2003 | | DONE |
|
|
|
|
| Sprinkler Plan Check | 9/22/2003 | | 9/22/2003 | | PASS |
Bill Alexander
|
|
|
Plans approved with comments
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2003 | | DONE |
Bill Alexander
|
|
|
|
| Inspection Record Card- Fire | 9/22/2003 | | 9/22/2003 | | DONE |
|
|
|
|
| Permit Ready to Issue | | | 9/22/2003 | | |
|
|
|
|
| Telephone call | | | 9/22/2003 | | DONE |
|
|
|
left mess that permit is ready
|
| Plan resubmittals received | | | 9/2/2003 | | DONE |
|
|
|
|
| Inspection Record Card- Fire | 8/19/2003 | | 8/19/2003 | | DONE |
|
|
|
|
| Telephone call | | | 8/19/2003 | | DONE |
|
|
|
This set of plans superceded by 9/2/03 resubmittal per Sam Rogers 9/22/03 BAM
|
| Plan assigned to (Bill) | 8/8/2003 | | 8/18/2003 | | DONE |
Bill Alexander
|
|
|
8/18/2003 15:55:35 JWA - activity updated through activity FIRA22 from case FIR03-00425.
|
| Sprinkler Plan Check | 8/15/2003 | | 8/18/2003 | | PART |
Bill Alexander
|
|
|
Plan is not approved. Work may proceed at contractors risk.
|
| Plan assigned to (Bill) | 8/15/2003 | | 8/18/2003 | | DONE |
Bill Alexander
|
|
|
8/18/2003 15:55:35 JWA - activity updated through activity FIRA22 from case FIR03-00425.
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2003 | | DONE |
Bill Alexander
|
|
|
This is a partial approval to proceed less approved plans.
|
| Plan resubmittals received | | | 8/15/2003 | | |
|
|
|
|
| Sprinkler Plan Check | 8/8/2003 | | 8/14/2003 | | FAIL |
Bill Alexander
|
|
|
Documents were bundled incorrectly in the 6 sets submittal provided. Returned to sender for correcting.
|
| Telephone call | | | 8/14/2003 | | DONE |
|
|
|
Documents are bundled incorrectly in the 6 sets submittal provided. Called Randy Bowron amd requested De Best send someone down to straighten the mess prior to reviewing. Resubmittal set aside untill then.
|
| Plan resubmittals received | | | 8/8/2003 | | |
|
|
|
|
| Plan resubmittals received | | | 8/5/2003 | | DONE |
|
|
|
per bill
|
| Plan assigned to (Bill) | 8/5/2003 | | 8/5/2003 | | DONE |
Bill Alexander
|
|
|
|
| Sprinkler Plan Check | 8/5/2003 | | 8/5/2003 | | FAIL |
Bill Alexander
|
|
|
Not designed for pyrotechnics (as requesting by the tenant).
|
| Telephone call | | | 8/5/2003 | | DONE |
|
|
|
Received a call from Bob Brady FPE (CSHQA) who is now involved with this project and the proposed pyrotechnics show relating to (protection requirements). He indicated a design for OH-2 would be sufficient. I requested a letter addressing the same and include the areas of performances shall be addressed the same, and relay the information to the Fire Sprinkler Contractor for design submittals and approval.
|
| Telephone call | | | 8/5/2003 | | DONE |
|
|
|
Contacted Jim Danes - De Best Fire Protection and indicated I have received plans that show light hazard protection and pyrotechnics will be involved. They should contact Bob Brady (CSHQA) and coodinate an approved design for the same and what shall I do with this submittal. He indicated to put it asside for now.
|
| Plan assigned to (Bill) | 7/29/2003 | | 7/30/2003 | | DONE |
Bill Alexander
|
|
|
|
| Sprinkler Plan Check | 7/29/2003 | | 7/30/2003 | | FAIL |
Bill Alexander
|
|
|
Sprinkler plans require verification of piping design through hydraulic calculations since approximately 50 heads have been installed on ONE 1½" line in the same areas on the first floor alone? Office, restrooms, hallway, janitors closet, cooler and breakroom, stairs, and foyer, (14 heads) have been installed on 1" piping and separation must be verified, in order to accept this piping (room design method) to apply, or calculations must be provided.
|
| Telephone call | | | 7/30/2003 | | DONE |
|
|
|
Called designer (John Venche) and gave information on first glance review. Asked if I should contiune in the review and was instructed "No." "I will verify it with calculations and resubmit." Will not proceed until verification of protection is provided.
|
| Miscellaneous action | | | 7/30/2003 | | DONE |
|
|
|
Emailed failed review (document).
|
| Application received | | | 7/29/2003 | | |
|
|
|
|
| Inspection Record Card- Fire | 8/19/2003 | | | | |
|
|
|
|