Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR03-00433
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameSPR Micron Building #24E
Customer NumberPCS# 24-20035870
ePlanReview 
Description
Micron Building #24E - To add and modify the existing fire sprinkler system for the relocation of 24YE to Building #24E Basement Room #003A, to convert the 2,200-ft/2 Storage Room #003A to a FAB 4 Yield Analysis Lab. This work is being done in the basement of Building #24E between grid lines 32&33 and C.2&E.5. Fire sprinkler work is related to the installation of a partition, suspended ceilings, and some mechanical and electrical. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-01706.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/19/20038/25/20038/25/2003APASS
DetailsRick Jackson
andy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
DOC - Permit Finaled8/25/20038/25/20038/25/2003PPASS
DetailsRick Jackson
Finaled by inspector at 8/25/2003 1:37:41 PM
Inspection Record Card- Fire8/15/2003 8/15/2003 DONE
Telephone call  8/15/2003 DONE
e-mailed that permit is ready
Issue and Print Permit  8/15/2003 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/14/2003 DONE
DetailsBill Alexander
Miscellaneous action  8/14/2003 DONE
Emailed review to Jerry O'Neal
Sprinkler Plan Check8/5/2003 8/13/2003 PASS
DetailsBill Alexander
Plan assigned to (Bill)8/4/2003 8/5/2003 DONE
8/5/2003 11:51:40 M_F - activity updated through activity FIRA22 from case FIR03-00413.
Application received  8/4/2003