INSP-Final Inspection | 11/3/2003 | 11/5/2003 | 11/5/2003 | P | PASS |
Rick Jackson
|
|
|
Rick; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
DOC - Permit Finaled | 11/5/2003 | 11/5/2003 | 11/5/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 11/5/2003 3:03:55 PM
|
Issue and Print Permit | | | 10/15/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/6/2003 | | 10/6/2003 | | PASS |
Bill Alexander
|
|
|
Plans modifications approved with comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 10/6/2003 | | 10/6/2003 | | DONE |
|
|
|
|
Telephone call | | | 10/6/2003 | | DONE |
|
|
|
Spoke with Diane told permit ready & fees
|
Permit Ready to Issue | | | 10/6/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/2/2003 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 9/23/2003 | 9/24/2003 | 9/24/2003 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/23/2003 at 2:08:37 PM. Contact: ###-####. first floor rough-in and hydro okay; resubmittals will be required if modifications are made to mezzanine approved plans 9/24/2003 1:50:44 PM
|
INSP-Final Inspection | 9/2/2003 | 9/2/2003 | 9/2/2003 | P | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 9/2/2003 at 8:48:18 AM. Contact: ###-####. this permit was called in from Simplex/Grinnell by mistake 9/2/2003 3:41:12 PM
|
Issue and Print Permit | | | 8/28/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/19/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 8/19/2003 | | 8/19/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/19/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (Bill) | 8/5/2003 | | 8/19/2003 | | DONE |
Bill Alexander
|
|
|
8/19/2003 11:58:16 JWA - activity updated through activity FIRA22 from case FIR03-00435.
|
Sprinkler Plan Check | 8/5/2003 | | 8/19/2003 | | PASS |
Bill Alexander
|
|
|
Revised water supply information provided 08/18/03.
|
Miscellaneous action | | | 8/11/2003 | | DONE |
|
|
|
Problem with current water supply information and existing system designs. Talked to Dave Miller 3:45 pm and his request is for Powerbar and United Water to address the existing deficiency prior to releasing this fire protection permit.
|
Telephone call | | | 8/11/2003 | | DONE |
|
|
|
Faxed a letter to Viking (attached) requesting existing system verification and current water supply provided, or verify current water supply again with United Water, etc.
|
Application received | | | 8/5/2003 | | |
|
|
|
|