Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberFIR03-00436
StatusFinaled
Name MICRON TECHNOLOGY INC FA
Site Address 8000 S FEDERAL WAY
Project Namealm - Micron
Customer NumberPCS 5846
ePlanReview 
Description
Demo smoke detectors above the ceiling (spaced in beam pockets) in rooms 110A and 110C. Add two (2) Vesda systems to sample at ceiling level, to be installed per NFPA 72 (spot type detectors). RTU-08 will require HVAC shutdown. Newly remodeled space has been upgraded for NAC coverage.

The associated building permit (BLD 03-01707) is to demo and remodel an approximate 1900 square foot area of the existing IS Machine Room 110B to create a new Netcom and Flash Lab/Office. This will include new interior partions, doors, electrical lighting and mechanical equipment. This work is being done on the first floor of Building #36 between grid lines 9&11 and C&D. All work per approved plans as drawn with redlined notes. Micron Building 36-Relocate Netcom and Flash Lab Areas (PCS #36-20035846) PC#409-03/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Alarm Testing12/10/200312/10/200312/10/2003PPASS
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
DOC - Permit Finaled12/10/200312/10/200312/10/2003PPASS
DetailsRick Jackson
Finaled by inspector at 12/10/2003 2:14:17 PM
INSP-Alarm Testing12/5/200312/5/200312/5/2003PFAIL
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Daniel Buccino RTU's didn't shut down as designed 12/5/2003 2:47:21 PM
Issue and Print Permit  10/16/2003 DONE
(F) Reprint permit  10/16/2003 DONE
Inspection Record Card- Fire10/9/2003 10/9/2003 DONE
Permit Ready to Issue  10/9/2003 DONE
Telephone call  10/9/2003 DONE
permit ready and fees due
Plan assigned to (SAM)8/6/2003 10/8/2003 DONE
Alarm Plan Check  10/8/2003 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  10/8/2003 DONE
Plan resubmittals received  9/30/2003  
Alarm Plan Check  8/26/2003 FAIL
Resubmittal Required. Faxed comments to Paul Marcolina 8/26/2003.
Telephone call  8/13/2003  
Clarification has requested from John James as to the installation of the Vesda piping. He will get back to me with the information.
Telephone call  8/12/2003  
Phone call into John James to clarify the Vesda piping locations.
Application received  8/6/2003