Permit Information
Permit NumberFIR03-00437
StatusFinaled
Name MICRON TECHNOLOGY INC FA
Site Address 8000 S FEDERAL WAY
Project Namealm - F1 remodel
Customer NumberPCS5709
ePlanReview 
Description
To upgrade notification devices in the corridors and the remodeled space. Heat detectors will be reinstalled (pre-action system) and two under floor smoke detectors shall be installed to an existing fire alarm system.

The associated building permit (BLD 03-01888) is to demo. clean room partitions and doors between Photo Bays #101D, #101E, #101F, Plenum #308 & Plenum #317. To saw cut an approximate 265 sq. ft. area of the existing concrete slab floor and excavate a 42 inch deep hole. To construct concrete retaining walls, new concrete slab and access floor system at that area. To add new clean room partitions and doors to reconfigure Plenum #308, shorten Plenum #317 and combine Photo Bay areas #101D, #101E & #101F. This work also include installing some additional clean room ceiling, installing new 2" industrial waste line and misc. exhaust, mechanical, process piping, electrical work, fire alarm and fire sprinkler work. This work is being done in an approximate 700 square foot area of the first floor of Building #3 between grid lines 6&8 and F&G. All construction per the approved plans and attached comment list. Micron Building #3 - F1 Remodel For ASML 850 SCN 2G2 * (PCS #20035709) PC#465-03/JCM

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Alarm Testing1/8/20041/8/20041/8/2004PPASS
DetailsRick Jackson
cell ph. ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
DOC - Permit Finaled1/8/20041/8/20041/8/2004PPASS
DetailsRick Jackson
Finaled by inspector at 1/8/2004 3:45:38 PM
FIR-Aging Inspection12/29/200312/29/200312/29/2003 PASS
DetailsRick Jackson
project is still in progress 12/29/2003 8:34:18 AM
Plan assigned to (SAM)8/6/2003 9/23/2003 DONE
Alarm Plan Check  9/23/2003 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  9/23/2003 DONE
Permit Ready to Issue  9/23/2003 DONE
Telephone call  9/23/2003 DONE
permit ready and fees due
Inspection Record Card- Fire9/23/2003 9/23/2003 DONE
Issue and Print Permit  9/23/2003 DONE
Telephone call  9/22/2003 DONE
I would like to discuss a couple of the responses from the comments from Paul Marcolina at Micron. I left a message and asked that he call me.
Plan resubmittals received  9/11/2003 DONE
Alarm Plan Check  8/26/2003 FAIL
Resubmittal required. Faxed comments to Paul Marcolina 8/26/2003.
Plan resubmittals received  8/13/2003  
Received updated fire alarm application via fax.
Miscellaneous action  8/12/2003  
Waiting for Building permit to be completed.
Miscellaneous action  8/12/2003  
Faxed request for completed application. See form with submittal.
Application received  8/6/2003