Permit Information
Permit NumberFIR03-00468
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 190 E BANNOCK ST
Project NameSPR ST LUKES-EAST TOWER
Customer Number 
ePlanReview 
Description
(ST LUKES-EAST TOWER- 2ND FLR) To modify and add fire sprinkler protection for the demolition and remodel of an 8,870-ft/2 Administrative Support area, full service hospital, for hospital staff, adjacent to and serving the new East Wing expansion NICU of the "I1.1". Fire sprinkler work is related to include non-combustible, fire-resistive, non-bearing walls to create occupancy separations at "new suites'"; occupancy separations per Table 3-C; rated corridor exit system; new administration, treatment & exam offices. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD01-02341.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in/Hydro8/23/20048/24/20048/24/2004APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 8/23/2004 at 2:52:13 PM. Contact: ###-####. Storage room completed to meet OH with minor changes made to head layout to reflect correct branch line layout that is different than shown on plans 8/24/2004 10:28:08 AM
DOC - Permit Finaled8/24/20048/24/20048/24/2004APASS
DetailsRick Jackson
Finaled by inspector at 8/24/2004 10:28:13 AM
INSP-Sprinkler Rough-in/Hydro8/17/20048/18/20048/18/2004ACANC
DetailsTroy Cobbley
Scheduled by a contractor via Hello! on 8/17/2004 at 11:42:05 AM. Contact: ###-####.
INSP-Sprinkler Rough-in/Hydro4/21/20044/21/20044/21/2004PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 4/21/2004 at 10:40:03 AM. Contact: ###-####. Okay to cover; this is a phased project and the current waiting room has two heads and will be overspaced when it is changed to storage room (shown with three heads on plans for OH); minor changes made due to mechanical duct work 4/21/2004 2:06:59 PM
FIR-Aging Inspection12/8/200312/8/200312/8/2003 PASS
DetailsRick Jackson
this project is still ongoing 12/8/2003 12:54:54 PM
Inspection Record Card- Fire9/2/2003 9/2/2003 DONE
Telephone call  9/2/2003 DONE
permit ready and fees due
Issue and Print Permit  9/2/2003 DONE
Plan assigned to (Bill)8/19/2003 8/29/2003 DONE
8/29/2003 16:05:15 JWA - activity updated through activity FIRA22 from case FIR03-00468.
Sprinkler Plan Check8/19/2003 8/29/2003 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  8/29/2003 DONE
DetailsBill Alexander
Miscellaneous action  8/29/2003 DONE
Emailed review to Brodie Stenquist.
Application received  8/19/2003