INSP-Final Inspection | 11/24/2003 | 11/25/2003 | 11/25/2003 | P | PASS |
Troy Cobbley
|
|
|
fire life safety, fire sprinkler and fire alarm finaled 11/25/2003 3:16:28 PM
|
INSP-Final Inspection | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | PASS |
Troy Cobbley
|
|
|
|
DOC - Permit Finaled | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 11/25/2003 3:14:42 PM
|
Alarm Plan Check | | | 11/19/2003 | | PASS |
|
|
|
Plan Modification. Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/19/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/19/2003 | | 11/19/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/19/2003 | | DONE |
|
|
|
|
Telephone call | | | 11/19/2003 | | DONE |
|
|
|
Spoke with Rob told him permit is ready & fees
|
Issue and Print Permit | | | 11/19/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/13/2003 | | DONE |
|
|
|
|
Telephone call | | | 11/10/2003 | | DONE |
|
|
|
Called Dan Hayes. The resubmittal for the plan modification to add the FM 200 panel was incomplete. A building plan is required. He had dropped off a copy of the FA 200 panel OEM on Friday. I stated that I needed two copies of each and a fire alarm application needs to be filled out.
|
INSP-Conference | 11/4/2003 | 11/4/2003 | 11/4/2003 | P | DONE |
Troy Cobbley
|
|
|
I issued a citation to Robert Ahten with Protex for the performance of fire alarm work without a permit. Specifically the connection of an FM200 system into the existing fire alarm system.
|
Miscellaneous action | | | 11/4/2003 | | |
|
|
|
Telephone call with Rob Ahten. Plan modification drawing package is incomplete. The review is on hold waiting for a new drawing package. (Either as a plan modification to this issued permit, or a new fire alarm permit application.)
|
INSP-Final Inspection | 10/21/2003 | 10/22/2003 | 10/22/2003 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Sam Rogers permission until the fire alarm interface with the FM200 releaseing panel has been submitted and approved. Also the egress doors with the door magnets need to be tested when installation is complete 10/22/2003 4:52:12 PM
|
Plan resubmittals received | | | 10/21/2003 | | DONE |
|
|
|
|
INSP-Final Inspection | 10/16/2003 | 10/17/2003 | 10/17/2003 | A | FAIL |
Troy Cobbley
|
|
|
No inspection done due to work not matching plans and work done without a permit. A new FM200 suppression system has been connected to the existing fire alarm system. This work is not shown on the approved fire alarm system. Lea Electric admitted to installing the wiring between the zoned panel and the releasing panel but no contractor will admitt to who did the interconnection. I spoke to Dave Miller. A pre-citation lette will be issued and if appropriate a citation will be issued. 10/17/2003 11:23:02 AM
|
Issue permit | | | 9/3/2003 | | |
|
|
|
|
Plan assigned to (SAM) | 8/19/2003 | | 9/2/2003 | | DONE |
|
|
|
9/2/2003 09:58:23 M_F - activity updated through activity FIRA22 from case FIR03-00469.
|
Alarm Plan Check | | | 9/2/2003 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/2/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/2/2003 | | 9/2/2003 | | DONE |
|
|
|
|
Telephone call | | | 9/2/2003 | | DONE |
|
|
|
permit ready and fees due
|
Application received | | | 8/19/2003 | | |
|
|
|
|