DOC - Permit Finaled | 12/10/2003 | 12/10/2003 | 12/10/2003 | A | PASS |
Troy Cobbley
|
|
|
|
INSP-Supply line flush | 12/2/2003 | 12/2/2003 | 12/2/2003 | P | PASS |
Rick Jackson
|
|
|
UG flush only okay 12/2/2003 3:36:44 PM
|
INSP-Sprinkler Rough-in | 11/10/2003 | 11/12/2003 | 11/12/2003 | A | PART |
Rick Jackson
|
|
|
Bruce; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes okay to cover outside canopy - plans show 155 heads but 200 installed; dry pendants not installed 11/12/2003 8:57:44 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/6/2003 | 10/6/2003 | 10/6/2003 | P | PART |
Rick Jackson
|
|
|
BRUCE; Phone #: ###-#### Internet Inspection Request from: Annette Moore UG hydro okay 10/6/2003 4:05:39 PM
|
INSP-Sprinkler Rough-in | 8/22/2003 | 8/25/2003 | 8/25/2003 | A | PART |
Troy Cobbley
|
|
|
Underground sprinkler piping is OK to cover 8/25/2003 10:47:09 AM
|
Plan assigned to (Bill) | 8/19/2003 | | 8/22/2003 | | DONE |
Bill Alexander
|
|
|
8/22/2003 12:48:13 JWA - activity updated through activity FIRA22 from case FIR03-00474.
|
Sprinkler Plan Check | 8/21/2003 | | 8/22/2003 | | DONE |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2003 | | DONE |
Bill Alexander
|
|
|
|
Miscellaneous action | | | 8/22/2003 | | DONE |
|
|
|
Emailed review and notice of approval 12:50 pm.
|
Inspection Record Card- Fire | 8/22/2003 | | 8/22/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/22/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Issue permit | | | 8/22/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/21/2003 | | DONE |
|
|
|
|
Telephone call | | | 8/20/2003 | | DONE |
|
|
|
plans failed called to have them picked up
|
Sprinkler Plan Check | 8/19/2003 | | 8/20/2003 | | FAIL |
Bill Alexander
|
|
|
Need the following:
1. Type and size of material the underground riser is being installed with,
2. Appurtenance/detail information of thrust protection for the same (riser).
3. Dimensioning of pipe from bottom of footing,
4. Dimension of riser pipe around the floor,
5. Depth of bury throughout,
6. Distance of underground following the structures footing,
7. Include a directional arrow,
8. Information addressed on the plans that the outside shutoff will be provided at the riser in a 1 hour fire separated fire sprinkler control room, or provide an outside control P.I.V. with tamper supervision, etc.
|
Miscellaneous action | | | 8/20/2003 | | DONE |
|
|
|
Emailed failed review and request list for resubmittals.
|
Application received | | | 8/19/2003 | | |
|
|
|
|