INSP-Final Inspection | 3/1/2004 | 3/1/2004 | 3/1/2004 | P | PASS |
Rick Jackson
|
|
|
UG hydro okay
|
DOC - Permit Finaled | 3/1/2004 | 3/1/2004 | 3/1/2004 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 3/1/2004 5:34:11 PM
|
INSP-Supply line flush | 2/24/2004 | 2/24/2004 | 2/24/2004 | A | PASS |
Rick Jackson
|
|
|
UG flush okay; still needs hydro 2/24/2004 8:17:04 AM
|
INSP-Sprinkler Rough-in/Hydro | 10/8/2003 | 10/8/2003 | 10/8/2003 | P | PART |
Rick Jackson
|
|
|
SAM; Phone #: ###-#### Internet Inspection Request from: Darla Downs 10/8/2003 1:23:34 PM stub out okay for cover; will need hydro and flush 10/8/2003 1:24:17 PM
|
INSP-Sprinkler Rough-in | 9/17/2003 | 9/18/2003 | 9/18/2003 | A | PART |
Troy Cobbley
|
|
|
Inspection was for the thustblock only. No approved plans were on site to do the inspection on the stub out. I told sam with treasure valley fire not to cover pipe until the plans could be reviewed. Thrust block was ok 9/18/2003 9:38:17 AM
|
Plan assigned to (Bill) | 8/26/2003 | | 8/27/2003 | | DONE |
|
|
|
8/27/2003 09:21:16 JWA - activity updated through activity FIRA22 from case FIR03-00495.
|
Sprinkler Plan Check | 8/26/2003 | | 8/27/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/27/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 8/27/2003 | | 8/27/2003 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/27/2003 | | DONE |
|
|
|
|
Application received | | | 8/26/2003 | | |
|
|
|
|