Permit Information
Permit NumberFIR03-00499
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 10539 W OVERLAND RD
Project NameSPR HASTING
Customer Number 
ePlanReview 
Description
(HASTINGS)(COUNTRY SQUARE SHOPPING CENTER) Modification of fire sprinkler protection for the remodel to an existing 22,835-ft/2 retail space in an existing building per plans on file. Remodel work involves a new coffee bar, new office, new break room, new storage/processing areas, and two new restrooms. Fire sprinkler work is related to interior demolition work, some new interior walls, some suspended ceiling work. Code upgrade agreement on file for this shopping center to be completed prior to issuing a permanent Certificate of Occupancy for this tenant. Sagging insulation obstructing some sprinkler heads and insulation backing flame spread rating above suspended ceiling to be addressed and corrected in this space and throughout the entire shopping center under this permit. A new Certificate of Occupancy is to be issued when all work is completed and approved. This building is fully fire sprinklered for area increase. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-01324.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/6/200310/6/200310/6/2003PPASS
DetailsRick Jackson
The three heads were added as noted. Please re-inspect. If you need me there just let me know Thanks.; Phone #: ###-#### Internet Inspection Request from: Trent Bice
DOC - Permit Finaled10/6/200310/6/200310/6/2003PPASS
DetailsRick Jackson
Finaled by inspector at 10/6/2003 1:27:29 PM
INSP-Final Inspection9/30/20039/30/20039/30/2003PFAIL
DetailsTroy Cobbley
pendants are overspace and do not match plans in the cafe area, provide pendant by managers office, install tile in stockroom 9/30/2003 2:21:26 PM
INSP-Sprinkler Rough-in/Hydro9/18/20039/18/20039/18/2003PCANC
DetailsTroy Cobbley
###-#### Per Forest (shilo automatic sprinkler) the inspection is to be cancelled due to missing sprinkler canopies 9/18/2003 2:44:05 PM
Issue and Print Permit  9/18/2003 DONE
Plan assigned to (Bill)8/27/2003 9/17/2003 DONE
Sprinkler Plan Check9/17/2003 9/17/2003 PASS
DetailsBill Alexander
Plans approved with comments
PLANS/APPL TAKEN TO FRONT DESK  9/17/2003 DONE
DetailsBill Alexander
Inspection Record Card- Fire9/17/2003 9/17/2003 DONE
Permit Ready to Issue  9/17/2003 DONE
Telephone call  9/17/2003 DONE
permit ready and fees due
Application received  8/27/2003  
Telephone call  8/8/2003  
Telcon from Dennis Potter, Steed Const 8/7/03 with request for approval to proceed with TI work before permit is issued since they have begun on the sprinkler upgrade work per the application for this permit. I indicated I couldn't give that approval. Discussed with Jason Blais, who indicated that based on the commitment made in Pete Conlon's letter dated 8/1/03 to Tim Hogland, to complete all sprinkler upgrade work within all tenant spaces stipulated in the original sprinkler upgrade agreement, Tim has agreed to allow us to issue permits to Hastings, but will only allow a TOC to be issued to Hastings when their TI work is completed. This FIR permit is to be phased to include all sprinkler upgrade work for each tenant in the shopping center where sprinkler work is required to be done and is not to be finaled until all required work is satisfactorily completed. Hastings is not to receive a permanent CO until this permit has been finaled. It is understood the work is to be completed within the normal 90-day TOC period. No TI work is to be done without a BLD permit. Called Dennis 8/8/03, advised of these conditions and that I would be reviewing the BLD permit today and assuming no problems would probably be ready to be issued late Monday or Tues next week. Meantime, only work on the sprinkler system Phase One is approved to proceed under this FIR permit.