INSP-Final Inspection | 11/25/2003 | 12/2/2003 | 12/2/2003 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/25/2003 at 12:13:22 PM. Contact: ###-####. 17.2 amp hr batteries are installed, not the 18 amp hr shown on plans and 10 amp hr are required per plans; two additional RTU's will be installed in the future; address 12-16 were used instead of 5-8 12/2/2003 2:00:47 PM
|
DOC - Permit Finaled | 12/2/2003 | 12/2/2003 | 12/2/2003 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 12/2/2003 2:00:53 PM
|
Permit Ready to Issue | | | 10/30/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/30/2003 | | 10/30/2003 | | DONE |
|
|
|
|
Telephone call | | | 10/30/2003 | | DONE |
|
|
|
Spoke with Peter told permit ready & fees
|
Issue and Print Permit | | | 10/30/2003 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 8/27/2003 | | 10/29/2003 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/29/2003 | | DONE |
|
|
|
|
Alarm Plan Check | | | 10/29/2003 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
Plan resubmittals received | | | 10/20/2003 | | DONE |
|
|
|
|
Alarm Plan Check | | | 9/10/2003 | | FAIL |
|
|
|
Resubmittal required. Faxed comments to Peter Petroni 9/10/2003.
|
Telephone call | | | 9/9/2003 | | |
|
|
|
Left a message for Peter Petroni regarding the functionality of the duct detectors to "alarm" the panel. IFC 2000 states it should be a supervisory signal. Peter is out of the office until tomorrow.
|
Application received | | | 8/27/2003 | | |
|
|
|
|