INSP-Final Inspection | 6/18/2004 | 6/18/2004 | 6/18/2004 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
DOC - Permit Finaled | 6/18/2004 | 6/18/2004 | 6/18/2004 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 6/18/2004 3:31:34 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/4/2004 | 5/5/2004 | 5/5/2004 | A | PART |
Troy Cobbley
|
|
|
Inspection was for covering of the piping for the first floor corridor. Piping is OK to cover but two heads need to be relocated from the supply diffusers or higher temp heads used and three pendants have not been installed yet. Head in elevator not installed yet. 5/5/2004 10:37:57 AM
|
INSP-Sprinkler Rough-in/Hydro | 2/18/2004 | 2/18/2004 | 2/18/2004 | P | PART |
Troy Cobbley
|
|
|
second floor insulation ok and sprinkler piping is ok to cover
|
INSP-Sprinkler Rough-in | 2/4/2004 | 2/4/2004 | 2/4/2004 | A | PART |
Troy Cobbley
|
|
|
Third floor sprinkler piping is ok to cover
|
Issue and Print Permit | | | 1/27/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 1/14/2004 | | 1/26/2004 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 1/14/2004 | | 1/26/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/26/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/26/2004 | | DONE |
|
|
|
spoke with John -- permit is ready.
|
FIR-Aging Inspection | 1/15/2004 | 1/15/2004 | 1/15/2004 | | NR |
Troy Cobbley
|
|
|
work in progress 1/15/2004 11:10:11 AM
|
Plan resubmittals received | | | 1/14/2004 | | |
|
|
|
|
Issue and Print Permit | | | 10/16/2003 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 9/18/2003 | | 10/16/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/8/2003 | | 10/16/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2003 | | DONE |
Bill Alexander
|
|
|
|
Miscellaneous action | | | 10/15/2003 | | DONE |
|
|
|
Took partially approved plans to the front desk for permitting and issueing. Emailed copy to designer.
|
Inspection Record Card- Fire | 10/15/2003 | | 10/15/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/15/2003 | | |
|
|
|
|
Telephone call | | | 10/15/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Plan resubmittals received | | | 10/8/2003 | | DONE |
|
|
|
|
Telephone call | | | 10/6/2003 | | DONE |
|
|
|
called plans denied
|
Sprinkler Plan Check | 10/3/2003 | | 10/3/2003 | | PART |
Bill Alexander
|
|
|
Plans given a partial approval, until resubmittals are received, so the sprinkler contractor can proceed with installation at their own risk. Review comments faxed to fire sprinkler contractor. Plans taken to front for pickup.
|
Application received | | | 9/18/2003 | | |
|
|
|
|