INSP-Final Inspection | 11/24/2003 | 11/24/2003 | 11/24/2003 | A | PASS |
Troy Cobbley
|
|
|
|
DOC - Permit Finaled | 11/24/2003 | 11/24/2003 | 11/24/2003 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 11/24/2003 11:18:34 AM
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2003 | 11/20/2003 | 11/20/2003 | P | PASS |
Troy Cobbley
|
|
|
overhead hydro test is ok. Anti-freeze system hydro test is ok 11/20/2003 3:46:12 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/14/2003 | 11/14/2003 | 11/14/2003 | P | PASS |
Troy Cobbley
|
|
|
Underground hydro is OK
|
Permit Ready to Issue | | | 11/14/2003 | | DONE |
|
|
|
|
Telephone call | | | 11/14/2003 | | DONE |
|
|
|
Spoke with Gerald and told permit is ready & fees
|
Plan assigned to (Bill) | 11/10/2003 | | 11/13/2003 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 11/10/2003 | | 11/13/2003 | | PASS |
Bill Alexander
|
|
|
Faxed calculations and 8.5 x 11 plan sheet to verify revised spacing installed which exceeds original approved designed.
11/12/03 - Requested calc cover sheet (by email).
11/13/03 - Received calc cover sheet (by fax).
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/13/2003 | | DONE |
|
|
|
|
Miscellaneous action | | | 11/12/2003 | | DONE |
|
|
|
Emailed Gerald Ebeling (12:05 pm), for a revised Fire Sprinkler Cover Sheet, which matches the same calculations provided.
|
INSP-Supply line flush | 11/7/2003 | 11/10/2003 | 11/10/2003 | A | PASS |
Troy Cobbley
|
|
|
underground flush is ok 11/10/2003 9:13:09 AM
|
INSP-Sprinkler Rough-in/Hydro | 11/7/2003 | 11/10/2003 | 11/10/2003 | A | FAIL |
Troy Cobbley
|
|
|
Measuring off of wall in anti-freeze area the upright sprinkler heads are over spaced, closet is missing sprinkler protection 11/10/2003 9:11:59 AM
|
Plan resubmittals received | | | 11/10/2003 | | |
Bill Alexander
|
|
|
|
INSP-Supply line flush | 10/9/2003 | 10/10/2003 | 10/10/2003 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/9/2003 at 12:42:30 PM. Contact: ###-####. see fir03-00376 10/10/2003 9:18:45 AM
|
Issue and Print Permit | | | 10/3/2003 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 9/18/2003 | | 10/2/2003 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 10/2/2003 | | 10/2/2003 | | PASS |
Bill Alexander
|
|
|
Plans approved with comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/2/2003 | | DONE |
Bill Alexander
|
|
|
|
Inspection Record Card- Fire | 10/2/2003 | | 10/2/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/2/2003 | | 10/2/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/2/2003 | | |
|
|
|
|
Telephone call | | | 10/2/2003 | | DONE |
|
|
|
left mess that permit is ready
|
Application received | | | 9/18/2003 | | |
|
|
|
|