INSP-Final Inspection | 3/22/2004 | 3/25/2004 | 3/25/2004 | P | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 3/22/2004 at 7:49:24 AM. Contact: ###-####.
|
DOC - Permit Finaled | 3/25/2004 | 3/25/2004 | 3/25/2004 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 3/25/2004 3:38:09 PM
|
INSP-Sprinkler Rough-in | 12/15/2003 | 12/16/2003 | 12/16/2003 | P | PASS |
Rick Jackson
|
|
|
reviewed resubmittals; okay to cover 12/16/2003 4:03:33 PM
|
INSP-Sprinkler Rough-in | 12/15/2003 | 12/15/2003 | 12/15/2003 | P | PART |
Rick Jackson
|
|
|
darrell; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie will need to verify resubmittals as office was locked 12/15/2003 3:52:53 PM
|
Issue permit | | | 12/10/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/5/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/4/2003 | | 12/5/2003 | | PASS |
Bill Alexander
|
|
|
Resubmittals indicating field changes and corrected matching nodes.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/5/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/5/2003 | | 12/5/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/5/2003 | | DONE |
|
|
|
|
Telephone call | | | 12/5/2003 | | DONE |
|
|
|
Left a meesage for James that permit is ready & fees
|
Plan assigned to (Bill) | 11/25/2003 | | 12/5/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/4/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/24/2003 | | 12/1/2003 | | FAIL |
Bill Alexander
|
|
|
Plans were not modified to field installation. Nodes do not corelate with calculations.
|
Telephone call | | | 12/1/2003 | | DONE |
|
|
|
Left message for James that plans failed and need picked up & re-submitted
|
INSP-Supply line flush | 11/25/2003 | 11/25/2003 | 11/25/2003 | P | PART |
Rick Jackson
|
|
|
darrell- ###-#### cell this inspection was for the UG (FIR03-00488) okay to cover; tenting not ready as it isn't completed and the batt isn't installed completely over the pipe 11/25/2003 4:48:12 PM
|
Plan resubmittals received | | | 11/25/2003 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/24/2003 | | DONE |
|
|
|
2nd floor and 3rd floor changes/resubmittals. Also calculations of the 2nd floor "tree" to verify a design that is not consistance with the 3rd floor "grid."
|
INSP-Sprinkler Rough-in/Hydro | 11/12/2003 | 11/14/2003 | 11/14/2003 | A | FAIL |
Rick Jackson
|
|
|
Chuck; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes need resubmittals due to numerous 90 and 45 degree changes; the line on the south end has shifted north; concealed space understairs in basement will need to be filled or rocked; will need tenting prior to cover and inspection 11/14/2003 3:51:02 PM
|
Issue permit | | | 11/6/2003 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 9/25/2003 | | 10/24/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 10/22/2003 | | 10/24/2003 | | PASS |
Bill Alexander
|
|
|
|
Miscellaneous action | | | 10/24/2003 | | DONE |
|
|
|
Emailed copy of review to Custom Sprinkler Corporation - customsprink@aol.com.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/24/2003 | | 10/24/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/24/2003 | | DONE |
|
|
|
|
Telephone call | | | 10/24/2003 | | DONE |
|
|
|
Left message that permit is ready & fees
|
Plan resubmittals received | | | 10/22/2003 | | |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 10/7/2003 | | 10/7/2003 | | TEMP |
Bill Alexander
|
|
|
Plans denied. Review comments faxed to the contractor. Denied plans at front desk for pick up.
|
Telephone call | | | 10/7/2003 | | DONE |
|
|
|
Left message for James that plans were denied and need picked up
|
Application received | | | 9/25/2003 | | |
|
|
|
|