Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR03-00571
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2252 S SUMPTER WAY
Project NameSPR UG Pepperhills/elem School
Customer Number 
ePlanReview 
Description
Pepperhills Elementary School * To construct a 61,000 sq. ft., one story, Type VA-1hr, fully fire sprinklered elementary school in accordance with the approved plans and attachments, CUP02-00135. Other work includes all site improvements, grading, paving and landscaping. All construction must be done in accordance with the City flood plain ordinance. Flood plain certificates are to be submitted prior to calling for final inspection.
Fire sprinkler work covered under this permit is to install 140'-0" of new 6" underground fire sprinkler supply piping. Work is to also include the installation of a 6" Post Indicating Valve.
The fire sprinkler underground work shall comply with NFPA 13-1999, NFPA 24-1995 and the UFC-1997, attached review comment and conditions list, all as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-00781. A separate permit is required for above ground sprinkler work.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/24/20046/24/20046/24/2004PPASS
DetailsTroy Cobbley
Underground permit finaled
DOC - Permit Finaled6/24/20046/24/20046/24/2004PPASS
DetailsTroy Cobbley
Finaled by inspector at 6/24/2004 2:58:06 PM
INSP-Supply line flush11/18/200311/19/200311/19/2003PPASS
DetailsTroy Cobbley
Underground hydro test is ok 11/19/2003 3:24:56 PM
INSP-Sprinkler Rough-in10/6/200310/7/200310/7/2003APART
DetailsRick Jackson
Please call 1 hour prior to arrival;; Phone #: ###-#### Internet Inspection Request from: Trent Bice UG cover inspection only - okay; still need hydro and flush; 10/7/2003 12:59:22 PM
Issue permit  10/6/2003  
Plan assigned to (Bill)9/25/2003 10/3/2003 DONE
DetailsBill Alexander
Sprinkler Plan Check10/3/2003 10/3/2003 PASS
DetailsBill Alexander
Plans approved with comments
PLANS/APPL TAKEN TO FRONT DESK  10/3/2003 DONE
DetailsBill Alexander
Inspection Record Card- Fire10/3/2003 10/3/2003 DONE
Telephone call  10/3/2003 DONE
Left message for Bob Knight that permit is ready & fees
Permit Ready to Issue  10/3/2003 DONE
Application received  9/25/2003