INSP-Final Inspection | 6/18/2004 | 6/18/2004 | 6/18/2004 | A | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 6/18/2004 | 6/18/2004 | 6/18/2004 | A | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 6/18/2004 10:42:01 AM
|
INSP-Final Inspection | 6/17/2004 | 6/17/2004 | 6/17/2004 | P | FAIL |
Rick Jackson
|
|
|
Need address; knox box; EL's not charged; need lock out on bell breaker; extinguishers 6/17/2004 5:11:24 PM
|
INSP-Sprinkler Rough-in/Hydro | 5/24/2004 | 5/24/2004 | 5/24/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 5/24/2004 at 10:24:34 AM. Contact: ###-####. Hydro on overhead and FDC okay 5/24/2004 2:31:19 PM
|
INSP-Sprinkler Rough-in | 4/21/2004 | 4/21/2004 | 4/21/2004 | P | NR |
Rick Jackson
|
|
|
Jeff; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes Received call from Jeff and all of the heads aren't installed in the canopy 4/21/2004 1:29:56 PM
|
INSP-Sprinkler Rough-in | 4/21/2004 | 4/21/2004 | 4/21/2004 | P | PART |
Rick Jackson
|
|
|
Met with Jeff of TVFP and per Dave Miller the dry sidewalls in the front canopy have been approved with two additional heads; okay to cover the interior walls at piping to canopy 4/21/2004 2:33:03 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/17/2004 | 2/18/2004 | 2/18/2004 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/17/2004 at 1:07:04 PM. Contact: ###-####. okay to cover hard lid areas; concealed combustible space around fireplace will require sprinklers; EQ at riser not completed; as-builts needed for minor changes; front canopy not sprinklered per plans as the construction of the canopy has changed - sidewall heads won't meet listing for smooth ceiling 2/18/2004 3:49:27 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/2/2004 | 2/3/2004 | 2/3/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 2/2/2004 at 9:14:05 AM. resubmittals needed for changes to dry sidewalls that will be deleted as the rear canopy is not installed and the main lobby canopy has changed to open beams and sidewalls won't work; there are changes to several areas of the 4 inch main (all EQ's not completed) to get around duct, etc; changes made on branch lines due to added closets; heads added under stairs in basement; the main auditorium lines are not installed; okay to cover hard lid areas; head legend shows all uprights in concealed spaces with pendants used in some areas; riser not completed 2/3/2004 2:01:56 PM
|
Permit Ready to Issue | | | 1/30/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/30/2004 | | 1/30/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/30/2004 | | DONE |
|
|
|
Spoke with Brodie and told him that permit is ready & the fees//1/30/04 8:23am BAM
|
CHANGE STATUS TO (ISS) | | | 1/30/2004 | | DONE |
|
|
|
already pd fees before
|
Plan assigned to (Bill) | 1/28/2004 | | 1/29/2004 | | DONE |
Bill Alexander
|
|
|
Faxed field changes
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/28/2004 | | 1/29/2004 | | PART |
|
|
|
Still lack review note items #1 thru 6.
|
Plan resubmittals received | | | 1/28/2004 | | DONE |
|
|
|
|
FIR-Aging Inspection | 1/12/2004 | 1/12/2004 | 1/12/2004 | | PASS |
Rick Jackson
|
|
|
project is still in progress 1/12/2004 7:08:42 AM
|
Issue and Print Permit | | | 10/13/2003 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 10/2/2003 | | 10/10/2003 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 10/10/2003 | | 10/10/2003 | | PART |
Bill Alexander
|
|
|
I have approved this project with exceptions. These need verified with a
resubmittal and revised approved plans on site prior to final acceptance and
signoff. A resubmittal is required.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2003 | | DONE |
Bill Alexander
|
|
|
|
Permit Ready to Issue | | | 10/10/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 10/10/2003 | | 10/10/2003 | | DONE |
|
|
|
|
Telephone call | | | 10/10/2003 | | DONE |
|
|
|
Spoke with Jason and told permit ready & fees
|
Application received | | | 10/2/2003 | | |
|
|
|
|