Permit Information
Permit NumberFIR03-00616
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 11 N LATAH ST
Project NameSPR Ahavath Beth Israel-Synag
Customer Number 
ePlanReview 
Description
Ahavath Beth Israel - Relocate Synagogue Building - To install a complete, wet light hazard system in a new 1500-ft/2 basement/foundation and existing 1,800-ft/2 historical building per plans and attachments. This structure will be fire sprinklered throughout for area and number of stories. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. The underground fire service main was installed under FIR03-00239. This permit is attached to building permit: BLD03-00965.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/3/20043/3/20043/3/2004PPASS
DetailsRick Jackson
DOC - Permit Finaled3/3/20043/3/20043/3/2004PPASS
DetailsRick Jackson
Finaled by inspector at 3/3/2004 3:45:20 PM
INSP-Sprinkler Rough-in/Hydro3/1/20043/2/20043/2/2004APASS
DetailsRick Jackson
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes overhead hydro okay; need to test tampers/flows etc. 3/2/2004 1:14:35 PM
INSP-Sprinkler Rough-in/Hydro3/1/20043/1/20043/1/2004PFAIL
DetailsRick Jackson
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes hydro failed; will reschedule 3/1/2004 4:45:53 PM
INSP-Sprinkler Rough-in/Hydro2/23/20042/24/20042/24/2004APART
DetailsRick Jackson
mike; Phone #: ###-#### Internet Inspection Request from: Annette Moore UG flush only for the relocated building sprinkler system - okay; attempted to forward flow the BFP through the 2 inch drain and the pitot reading was 10 psi - needed 12 psi to obtain the required flow 2/24/2004 10:06:41 AM
INSP-Sprinkler Rough-in1/8/20041/9/20041/9/2004APART
DetailsRick Jackson
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie soffiit areas okay to cover; minor modifications made under stairs 1/9/2004 10:52:54 AM
INSP-Sprinkler Rough-in/Hydro12/22/200312/22/200312/22/2003PPART
DetailsRick Jackson
Don; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes peak and northside lower area tented okay; electrical work still in progress on the south lower side - not tented yet 12/22/2003 3:18:08 PM
INSP-Sprinkler Rough-in12/19/200312/19/200312/19/2003PPART
DetailsRick Jackson
Don; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes r/i for the branch lines at the peak and at the two lower levels on the first floor; will need to verify tenting prior to cover and insulation 12/19/2003 2:57:45 PM
Sprinkler Plan Check10/13/2003 10/13/2003 PASS
DetailsBill Alexander
Plans approved with comments
PLANS/APPL TAKEN TO FRONT DESK  10/13/2003 DONE
DetailsBill Alexander
Inspection Record Card- Fire10/13/2003 10/13/2003 DONE
Permit Ready to Issue  10/13/2003 DONE
Telephone call  10/13/2003 DONE
Spoke with Greg Johnson told permit is ready & fees
Issue and Print Permit  10/13/2003 DONE
Application received  10/10/2003  
Plan assigned to (Bill)10/13/2003 10/10/2003 DONE
DetailsBill Alexander