Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR03-00623
StatusFinaled
Name SIMPLEX/GRINNELL
Site Address 1055 N CURTIS RD
Project Namealm - St Als RMC Rad Ono EXP
Customer Number 
ePlanReview 
Description
To add strobes, chimes and smoke detectors to a required manual fire alarm system that includes sprinkler monitoring, HVAC shutdown, elevator recall/shutdown, fire/smoke damper controls, door release, partial area coverage and A/V notification.

2/10/2004 - Three (3) in-duct smoke detectors are added for fire/smoke damper control.

The associated building permit (BLD 03-01197) is to construct an 800 square foot, one story, reinforced concrete Radiation Oncology addition at the north end of the north tower for new equipment and to demolish and remodel an approximate 3700 square foot area of the first floor and approximately 500 square feet on the second floor. This remodel is for office area surrounding the new addition at the first floor and for office area directly above on the second floor. All construction per the approved plans and attached comment list. CZC03-00071/PC#298-03/JCM Saint Alphonsus Medical Center (North Tower) * Radiation Oncology Expansion and Renovation

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/3/20043/3/20043/3/2004PPASS
DetailsTroy Cobbley
fire alarm finaled 3/3/2004 12:39:51 PM
DOC - Permit Finaled3/3/20043/3/20043/3/2004PPASS
DetailsTroy Cobbley
Finaled by inspector at 3/3/2004 12:39:55 PM
Issue and Print Permit  2/18/2004 DONE
Alarm Plan Check  2/10/2004 PASS
Plan Modification. Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  2/10/2004 DONE
Permit Ready to Issue  2/10/2004 DONE
Telephone call  2/10/2004 DONE
left a message for Charlie -- permit is ready.
Plan resubmittals received  2/4/2004 DONE
INSP-Final Inspection1/28/20041/30/20041/30/2004APART
DetailsTroy Cobbley
Offices on the north side of the corridor are ok to occupy. A a/v needs to be added in room 104/105 1/30/2004 8:39:19 AM
Issue and Print Permit  1/13/2004 DONE
Plan assigned to (SAM)10/15/2003 1/2/2004 DONE
Alarm Plan Check  1/2/2004 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  1/2/2004 DONE
Permit Ready to Issue  1/2/2004 DONE
Inspection Record Card- Fire1/2/2004 1/2/2004 DONE
Telephone call  1/2/2004 DONE
Office closed for holiday could not leave message will try again on Monday 01/05/04....
Plan resubmittals received  12/15/2003 DONE
Alarm Plan Check  11/16/2003 FAIL
Resubmittal required. Faxed comments to Charlie Bayne 11/16/2003.
Plan resubmittals received  11/4/2003 DONE
Received updated drawings per the faxed request.
Miscellaneous action  10/28/2003 DONE
Faxed request for additional information on the application i.e. bldg permit # and system coverage. Also requested clarification of work area. Faxed 10/28/2003.
Application received  10/15/2003