INSP-Sprinkler Rough-in/Hydro | 4/26/2004 | 4/27/2004 | 4/27/2004 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/26/2004 at 1:45:19 PM. Contact: ###-####. R/I and final okay; minor changes to head layout at west end - spacing okay 4/27/2004 1:22:01 PM
|
DOC - Permit Finaled | 4/27/2004 | 4/27/2004 | 4/27/2004 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 4/27/2004 1:22:04 PM
|
INSP-Sprinkler Rough-in/Hydro | 4/15/2004 | 4/15/2004 | 4/15/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 4/15/2004 at 9:51:31 AM. Contact: ###-####. North side rooms okay to cover; heads in corridor and east room heads not cut to ceiling 4/15/2004 2:45:35 PM
|
INSP-Sprinkler Rough-in | 2/26/2004 | 2/26/2004 | 2/26/2004 | P | PART |
Rick Jackson
|
|
|
Sprinklers not in final location but do provide coverage during remodel 2/26/2004 11:31:18 AM
|
Miscellaneous action | | | 1/23/2004 | | DONE |
|
|
|
12/23/2004 - Ron Stenguist called and indicated this floor (permitted with FIR03-00725) was piped with CPVC. They are removing all CPVC and replacing with Dynaflow/Steel.
Indicated that no review will be required unless changing the design and to add a required hydrotest.
|
CHANGE STATUS TO (ISS) | | | 1/23/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 11/24/2003 | | 11/25/2003 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/24/2003 | | 11/25/2003 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/25/2003 | | DONE |
|
|
|
|
Miscellaneous action | | | 11/25/2003 | | DONE |
|
|
|
Emailed a copy of review to Jeff Anderson.
|
Permit Ready to Issue | | | 11/25/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 11/25/2003 | | 11/25/2003 | | DONE |
|
|
|
|
Telephone call | | | 11/25/2003 | | DONE |
|
|
|
Spoke with Jeff and told him permit is ready & fees
|
Application received | | | 11/24/2003 | | |
|
|
|
|