Plan assigned to (Bill) | 12/10/2003 | | 12/12/2004 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/20/2004 | 5/21/2004 | 5/21/2004 | A | CANC |
Troy Cobbley
|
|
|
Duplicate inspection 5/21/2004 10:41:11 AM
|
INSP-Final Inspection | 5/21/2004 | 5/21/2004 | 5/21/2004 | A | PASS |
Troy Cobbley
|
|
|
FIRE SPRINKLERS FINALED
|
DOC - Permit Finaled | 5/21/2004 | 5/21/2004 | 5/21/2004 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 5/21/2004 10:39:32 AM
|
INSP-Final Inspection | 5/18/2004 | 5/19/2004 | 5/19/2004 | P | FAIL |
Troy Cobbley
|
|
|
Remove handles on the valves, provide nfpa 25, provide head wrench and provide tag on riser 5/19/2004 1:53:55 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/20/2004 | 1/20/2004 | 1/20/2004 | P | PART |
Troy Cobbley
|
|
|
the remaining sprinkler piping is OK to cover 1/20/2004 2:40:09 PM
|
INSP-Sprinkler Rough-in | 1/16/2004 | 1/16/2004 | 1/16/2004 | P | FAIL |
Troy Cobbley
|
|
|
see approved sprinkler plans for locations where the insulation for the tenting of the sprinkler piping is not secured 1/16/2004 3:01:02 PM
|
CHANGE STATUS TO (ISS) | | | 1/16/2004 | | DONE |
|
|
|
changed status to issued fees waived for habitat of humanity
|
(F) Reprint permit | | | 1/16/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/16/2004 | | 1/16/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/15/2004 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 1/8/2004 | | 1/15/2004 | | PASS |
Bill Alexander
|
|
|
|
Telephone call | | | 1/15/2004 | | DONE |
|
|
|
permit ready card issued previously no fees due
|
Plan resubmittals received | | | 1/8/2004 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in/Hydro | 12/29/2003 | 12/30/2003 | 12/30/2003 | P | NR |
Troy Cobbley
|
|
|
inspection was just for a initial look at what is being installed. The contractor still needs to resubmit plans and all of the tenting of the sprinkler piping had not been done 12/30/2003 2:20:07 PM
|
CHANGE STATUS TO (ISS) | | | 12/29/2003 | | DONE |
|
|
|
fees waived per linda hartwell changed status to issued
|
Sprinkler Plan Check | 12/10/2003 | | 12/12/2003 | | PART |
Bill Alexander
|
|
|
Resubmittal of corrected plans and calcuations required. Allowed to proceed with partial approval.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2003 | | DONE |
Bill Alexander
|
|
|
|
Miscellaneous action | | | 12/12/2003 | | DONE |
|
|
|
emailed copy of review notes to Ron Larson.
|
Inspection Record Card- Fire | 12/12/2003 | | 12/12/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/12/2003 | | DONE |
|
|
|
|
Telephone call | | | 12/12/2003 | | DONE |
|
|
|
Left message for ron that permit is ready and that the fees are waived since this is a boise habitat for humanity home//12/12/03 BAM
|
Application received | | | 12/10/2003 | | |
|
|
|
|
Plan assigned to (Bill) | 1/8/2004 | | | | |
|
|
|
|