INSP-Final Inspection | 2/5/2004 | 2/6/2004 | 2/6/2004 | A | PASS |
Troy Cobbley
|
|
|
fire alarm finaled 2/6/2004 11:05:52 AM
|
DOC - Permit Finaled | 2/6/2004 | 2/6/2004 | 2/6/2004 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 2/6/2004 11:05:58 AM
|
INSP-Final Inspection | 2/4/2004 | 2/4/2004 | 2/4/2004 | P | FAIL |
Troy Cobbley
|
|
|
The contractor replaced the existing battery cabinet with another that is not listed for this use. A minimum of 8 ah batteries are required. 2/4/2004 4:43:48 PM
|
INSP-Final Inspection | 2/2/2004 | 2/2/2004 | 2/2/2004 | P | FAIL |
Troy Cobbley
|
|
|
provide correct batteries, relocate the horn/strobe to a normally occuped area, monitoring service did not receive the correct signals 2/2/2004 3:28:34 PM
|
Plan assigned to (SAM) | 12/15/2003 | | 12/30/2003 | | DONE |
|
|
|
|
Alarm Plan Check | | | 12/30/2003 | | PASS |
|
|
|
Approved pending field inspection of fire alarm permit comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/30/2003 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/30/2003 | | 12/30/2003 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/30/2003 | | DONE |
|
|
|
|
Telephone call | | | 12/30/2003 | | DONE |
|
|
|
Spoke with Jason and told him permit is ready & fees//12/30/03 9:21 am
|
Issue permit | | | 12/30/2003 | | DONE |
|
|
|
|
Application received | | | 12/15/2003 | | |
|
|
|
|