INSP-Final Inspection | 2/18/2004 | 2/18/2004 | 2/18/2004 | P | PASS |
Troy Cobbley
|
|
|
fire sprinklers finaled
|
DOC - Permit Finaled | 2/18/2004 | 2/18/2004 | 2/18/2004 | P | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 2/18/2004 2:57:25 PM
|
Plan assigned to (Bill) | 2/6/2004 | | 2/9/2004 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 2/6/2004 | | 2/9/2004 | | PASS |
Bill Alexander
|
|
|
Revised calculations.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/9/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/9/2004 | | DONE |
|
|
|
spoke with Greg -- permit is ready.
|
Plan resubmittals received | | | 2/6/2004 | | DONE |
|
|
|
|
INSP-Final Inspection | 2/3/2004 | 2/4/2004 | 2/4/2004 | A | FAIL |
Troy Cobbley
|
|
|
Sprinkler pendants are overspaced on both sides of the storage room, their square footage runs from 124 to 182 sq. ft.. Sprinkler pendants are overspaced in the copier room. The room is 223 sq. ft. with two pendants in it which is 111 sq. ft. apiece. 1" sch 40 pipe has been used to suspend 1" sch 40 pipe between trusses 32" on center. Per NFPA 13 6.1.1.3a and 6.1.1.3b 1 1/4" pipe should be used. Also the trapeze must be secured to prevent slippage 2/4/2004 11:19:49 AM
|
Issue and Print Permit | | | 1/13/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/9/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/9/2004 | | 1/9/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/9/2004 | | DONE |
|
|
|
Spoke with Greg and told him permit is ready & fees//1/9/04 9:32am BAM
|
Plan assigned to (Bill) | 12/23/2003 | | 1/8/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/23/2003 | | 1/8/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2004 | | DONE |
|
|
|
|
Application received | | | 12/23/2003 | | |
|
|
|
|