INSP-Final Inspection | 2/4/2004 | 2/4/2004 | 2/4/2004 | P | PASS |
Rick Jackson
|
|
|
|
DOC - Permit Finaled | 2/4/2004 | 2/4/2004 | 2/4/2004 | P | PASS |
Rick Jackson
|
|
|
Finaled by inspector at 2/4/2004 3:12:01 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/22/2004 | 1/26/2004 | 1/26/2004 | P | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/22/2004 at 2:54:12 PM. Contact: ###-####. okay to cover suite 301 and areas as permited; this permit was not for the adjacent spaces; will need hydro test when r/i is complete for the entire floor 1/26/2004 3:32:08 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/13/2004 | 1/14/2004 | 1/14/2004 | A | PART |
Rick Jackson
|
|
|
kerry ; Phone #: ###-#### Internet Inspection Request from: Annette Moore okay to cover lobby area and there are heads needed at the ends of the lobby area; flexheads are okay without the screws per listing of the snap on head attachment 1/14/2004 10:18:20 AM
|
Issue and Print Permit | | | 1/12/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 12/29/2003 | | 1/9/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/29/2003 | | 1/9/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/9/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/9/2004 | | 1/9/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/9/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/9/2004 | | DONE |
|
|
|
left message with Tom Easton --- permit is ready.
|
Application received | | | 12/29/2003 | | |
|
|
|
|