INSP-Final Inspection | 6/29/2004 | 6/29/2004 | 6/29/2004 | A | PASS |
Troy Cobbley
|
|
|
Fire sprinkler finaled
|
DOC - Permit Finaled | 6/29/2004 | 6/29/2004 | 6/29/2004 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 6/29/2004 9:59:14 AM
|
INSP-Sprinkler Rough-in | 3/12/2004 | 3/15/2004 | 3/15/2004 | A | PASS |
Troy Cobbley
|
|
|
Main rough-in ok 3/15/2004 10:08:31 AM
|
INSP-Sprinkler Rough-in/Hydro | 3/11/2004 | 3/12/2004 | 3/12/2004 | A | PASS |
Troy Cobbley
|
|
|
hydro test on the dry pipe riser is OK 3/12/2004 11:20:23 AM
|
INSP-Sprinkler Rough-in/Hydro | 3/10/2004 | 3/11/2004 | 3/11/2004 | P | PART |
Troy Cobbley
|
|
|
24 hour air test is ok 3/11/2004 4:30:25 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/9/2004 | 3/10/2004 | 3/10/2004 | P | PART |
Troy Cobbley
|
|
|
Inspection was for the start of the 24 hour air test. Piping in the attic is at 49psi and the riser is at 46psi 3/10/2004 3:04:56 PM
|
INSP-Sprinkler Rough-in/Hydro | 3/8/2004 | 3/9/2004 | 3/9/2004 | P | PART |
Troy Cobbley
|
|
|
wet and dry system hydro test are ok 3/9/2004 4:06:43 PM
|
Plan assigned to (Bill) | 2/12/2004 | | 2/24/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/12/2004 | | 2/24/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/24/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/24/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/24/2004 | | DONE |
|
|
|
spoke with Ross --- permit is ready.
|
Issue and Print Permit | | | 2/24/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/24/2004 | | 2/24/2004 | | DONE |
|
|
|
|
INSP-Final Inspection | 2/12/2004 | 2/12/2004 | 2/12/2004 | A | PART |
Troy Cobbley
|
|
|
Temporary occupancy was given until all of the fire mains are upgraded per plans submitted to boise city and the fire alarm system is completed
|
Plan resubmittals received | | | 2/12/2004 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/10/2004 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/10/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 1/16/2004 | | 1/29/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/16/2004 | | 1/29/2004 | | PART |
Bill Alexander
|
|
|
Problem with existing calculations/design verification, new extended dry system calcs have 2 lines+ with glitches, Wet extended piping system is trapped and requires auxiliary drain (outside).
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/29/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/29/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/29/2004 | | 1/29/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/29/2004 | | DONE |
|
|
|
Left message that permit is ready & fees//1/29/04 12:12pm BAM
|
INSP-Sprinkler Rough-in/Hydro | 1/27/2004 | 1/28/2004 | 1/28/2004 | A | PART |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 1/27/2004 at 1:33:26 PM. Contact: ###-####. okay to cover wet system in office area - the 2.5 inch is not completed at the tie-in to the exsisting main; the dry system is installed in the attic area but the 4 inch main is not completed where it passes through the roof to tie it into the new riser (see plans) 1/28/2004 10:46:40 AM
|
Issue and Print Permit | | | 1/20/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 12/29/2003 | | 1/16/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2004 | | DONE |
Bill Alexander
|
|
|
|
Plan resubmittals received | | | 1/16/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/16/2004 | | 1/16/2004 | | DONE |
|
|
|
|
Telephone call | | | 1/16/2004 | | DONE |
|
|
|
CALLED JOHN PERMIT READY & FEE GIVEN 1-16-04 4:26 ///DLD
|
Sprinkler Plan Check | 12/29/2003 | | 1/13/2004 | | PART |
Bill Alexander
|
|
|
01/16/04 OK to start.
Required issues are attached.
|
Miscellaneous action | | | 1/13/2004 | | DONE |
|
|
|
Took failed plans to front desk for calling and returning.
|
Miscellaneous action | | | 1/13/2004 | | DONE |
|
|
|
Faxed copy of review to: ###-####
|
Telephone call | | | 1/13/2004 | | DONE |
|
|
|
spoke with John to let him know that the plans failed.
|
Application received | | | 12/29/2003 | | |
|
|
|
|