Permit Information
Permit NumberFIR03-00807
StatusFinaled
Name MICRON TECHNOLOGY INC FA
Site Address 8000 S FEDERAL WAY
Project Namealm - Micron Building #3
Customer Number6360
ePlanReview 
Description
To extend the existing required manual fire alarm system in to a newly remodeled clean room that includes HVAC shutdown, fire/smoke damper control and notification throughout. The existing system includes manual pull stations, door release, elevator recall/shutdown, HVAC shutdown, fire/smoke damper control, sprinkler monitoring and notification throughout.

The associated building permit (BLD 03-02947) is to demo the Pollution Abatement area and remodel for fab area. This work to include exterior wall modifications, constructing a new raised concrete loading dock with equipment lift. The interior remodel will include clean room walls, raised floor, HEPA ceiling system and all related plumbing, mechanical and electrical to create a dry etch bay and two plenum areas. This work also includes the remodel of the mechanical area at the second floor. This work is being done on the first and second floors of Building #3 between grid lines 1&4 and A&D. This permit also includes modification work at corridor 101P and reverse door swing at door #101B at Chemical Distribution Room 102I. This permit also includes the relocation and addition of some TCS units and related piping, mechanical and electrical at the second floor of Building #1 between grid lines B&C and 3&6. All construction per the approved plans and attached comment list. PC#759-03/JCM Micron Building #3 & #1 - Remodel Pollution Abatement for Production Tools *

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Alarm Testing5/12/20045/12/20045/12/2004PPASS
DetailsRick Jackson
Cell ph. ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
DOC - Permit Finaled5/12/20045/12/20045/12/2004PPASS
DetailsRick Jackson
Finaled by inspector at 5/12/2004 3:23:08 PM
Issue and Print Permit  4/1/2004 DONE
Alarm Plan Check  3/31/2004 PASS
Approved pending field inspection of fire alarm permit comments.
PLANS/APPL TAKEN TO FRONT DESK  3/31/2004 DONE
Inspection Record Card- Fire3/31/2004 3/31/2004 DONE
Permit Ready to Issue  3/31/2004 DONE
Telephone call  3/31/2004 DONE
email permit ready and fee due
Plan assigned to (Mary)12/20/2003 3/31/2004 DONE
Telephone call  3/30/2004 DONE
Request to Paul Marcolina for a site plan to be submitted with the 3rd submittal. He will drop it off this afternoon.
Plan resubmittals received  3/26/2004 DONE
Plan resubmittals received  3/17/2004 DONE
Telephone call  3/17/2004 DONE
Paul Marcolina, Justin Wood, the south door is not an exit from the building. Paul sent .pdf file to show the intent. (It is included in the city's copy of the permit package.) The duct detector for the fire smoke damper will be changed to an in-duct detector. Justin will forward cutsheets for the in-duct detector.
Alarm Plan Check  2/18/2004 FAIL
Resubmittal required. Faxed comments to Paul Marcolina 2/18/2004.
Miscellaneous action  1/13/2004  
Plans on hold pending IFC Building review.
Application received  12/30/2003