Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberFIR03-00814
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2895 S FEDERAL WAY
Project NameSPR UG Stone Mountain Flooring
Customer Number 
ePlanReview 
Description
Stone Mountain Flooring - (Shell) To install approximately 95'-0" of 6" PVC-C-900, from a 6" "key gate valve" in Victory, north into a proposed and designated fire sprinkler room control room, and up through the floor approximately 6" with 6" Class 50 D.I. to a flange adapter, on the south side of a new 35,675-, two story, concrete tilt-up shell building. This is an underground fire service supply permit only. Separate overhead fire sprinkler permit will be required for the building construction. The fire sprinkler underground work shall comply with NFPA 13-1999, NFPA 24-1995, IFC-2000 and the attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-02057.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection8/27/20048/27/20048/27/2004PPASS
DetailsRick Jackson
UG completed 8/27/2004 4:06:48 PM
DOC - Permit Finaled8/27/20048/27/20048/27/2004PPASS
DetailsRick Jackson
Finaled by inspector at 8/27/2004 4:06:52 PM
INSP-Sprinkler Rough-in/Hydro7/6/20047/7/20047/7/2004PPASS
DetailsRick Jackson
Phone #: ###-#### Internet Inspection Request from: Trent Bice UG permit completed for flush/hydro and cover; scope of this permit shows 6 inch for UG as 8 inch is installed; will need UG submittals at job site to close this permit out 7/7/2004 1:06:13 PM
INSP-Sprinkler Rough-in/Hydro7/6/20047/6/20047/6/2004PPART
DetailsRick Jackson
UG hydro okay - still need flush 7/6/2004 12:33:59 PM
INSP-Sprinkler Rough-in/Hydro6/22/20046/23/20046/23/2004AFAIL
DetailsRick Jackson
Johnathon; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes UG hydro failed; will still need to flush 6/23/2004 1:59:57 PM
Override - Parcel Holds1/1/19001/1/19006/22/2004  
fir inspection
Sprinkler Plan Check6/16/2004 6/16/2004 PASS
DetailsBill Alexander
Underground Fire Service Supply modifications due to United Water tap location.
Miscellaneous action  6/16/2004 DONE
Revised plans taken to the permit desk for aclling and issueing.
Telephone call  6/16/2004 DONE
spoke with Bob -- permit is ready.
Plan resubmittals received  6/14/2004 DONE
INSP-Sprinkler Rough-in6/9/20046/10/20046/10/2004APART
DetailsRick Jackson
###-#### trent Plan modifications made that will require resubmittals - increased to 8 inch and added two 90's; okay to cover 6/10/2004 8:04:19 AM
INSP-Sprinkler Rough-in3/23/20043/24/20043/24/2004APART
DetailsRick Jackson
5' stub only. Preferably first thing in the morning.; Phone #: ###-#### Internet Inspection Request from: Trent Bice Stub out only - okay 3/24/2004 8:00:34 AM
INSP-Sprinkler Rough-in3/23/20043/23/20043/23/2004PCANC
DetailsRick Jackson
All we have right now is the 5' stub out of the building. Preferably right after lunch for inspection to cover.; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
Plan resubmittals received  3/19/2004  
Plan assigned to (Bill)12/31/2003 1/13/2004 DONE
Sprinkler Plan Check12/31/2003 1/13/2004 PASS
DetailsBill Alexander
PLANS/APPL TAKEN TO FRONT DESK  1/13/2004 DONE
Inspection Record Card- Fire1/13/2004 1/13/2004 DONE
Permit Ready to Issue  1/13/2004 DONE
Telephone call  1/13/2004 DONE
spoke with Bob --- permit is ready.
Issue and Print Permit  1/13/2004 DONE
Application received  12/31/2003