INSP-Supply line flush | 4/22/2004 | 4/23/2004 | 4/23/2004 | A | PASS |
Troy Cobbley
|
|
|
fire sprinklers finaled 4/23/2004 9:15:06 AM
|
DOC - Permit Finaled | 4/23/2004 | 4/23/2004 | 4/23/2004 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 4/23/2004 9:15:19 AM
|
INSP-Sprinkler Rough-in/Hydro | 4/21/2004 | 4/22/2004 | 4/22/2004 | A | FAIL |
Troy Cobbley
|
|
|
Provide verification of flush, provide city approved plans for final inspection 4/22/2004 10:09:43 AM
|
INSP-Final Inspection | 4/22/2004 | 4/22/2004 | 4/22/2004 | P | CANC |
Troy Cobbley
|
|
|
Inspection rescheduled for 4/23/04 with plumber 4/22/2004 3:23:30 PM
|
INSP-Final Inspection | 4/22/2004 | 4/22/2004 | 4/22/2004 | P | CANC |
Troy Cobbley
|
|
|
duplicate inspection 4/22/2004 2:14:29 PM
|
INSP-Sprinkler Rough-in/Hydro | 2/23/2004 | 2/24/2004 | 2/24/2004 | A | PASS |
Troy Cobbley
|
|
|
sprinkler piping is ok to cover 2/24/2004 8:45:05 AM
|
Override - Parcel Holds | | | 2/23/2004 | | |
|
|
|
|
Override - Parcel Holds | | | 2/23/2004 | | |
|
|
|
|
Issue and Print Permit | | | 2/23/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 2/20/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 2/20/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 2/20/2004 | | |
|
|
|
|
Override - Parcel Holds | | | 2/20/2004 | | |
|
|
|
|
Inspection Record Card- Fire | 2/20/2004 | | 2/20/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/20/2004 | | DONE |
|
|
|
Left message that permti is ready & fees///2/20/04 9:28am BAM
|
INSP-Sprinkler Rough-in | 2/19/2004 | 2/19/2004 | 2/19/2004 | P | PART |
Troy Cobbley
|
|
|
Phoned bill alexander about status of permit and supposed conversation with the contrator. Bill stated that the contrator could cover piping that matched the original approved plan. I found three rooms that piping does match print. I marked these rooms on the on site approved plans. I placed re-inspection fees for the next inspection due to next inspection being the third time for the same issue (trying to get a cover inspection with out approved plans) 2/19/2004 12:33:42 PM
|
Sprinkler Plan Check | 2/11/2004 | | 2/19/2004 | | PASS |
Bill Alexander
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/19/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 2/11/2004 | | 2/19/2004 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 2/18/2004 | 2/18/2004 | 2/18/2004 | P | PART |
Troy Cobbley
|
|
|
sprinkler piping roughin ok based on resubmitted plans on site. The sprinkler rough-in approval is based on the resubmitted plans being approved and matching installation. 2/18/2004 4:17:34 PM
|
Plan resubmittals received | | | 2/11/2004 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/6/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 1/21/2004 | | 2/3/2004 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/3/2004 | | 2/3/2004 | | PART |
Bill Alexander
|
|
|
Partial approval. Need resubmittal. Lack protection on common wall with the garage. Overspacing of sprinkler, lack of coverage in mechanical closet, need verification of all rrooms/areas and more. See review notes.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/3/2004 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 2/3/2004 | | 2/3/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/3/2004 | | DONE |
|
|
|
left a message for Jon -- permit is ready.
|
Permit Ready to Issue | | | 2/3/2004 | | DONE |
|
|
|
|
Application received | | | 1/21/2004 | | |
|
|
|
|