INSP-Final Inspection | 4/2/2004 | 4/2/2004 | 4/2/2004 | A | PASS |
Troy Cobbley
|
|
|
fire sprinkler finaled
|
DOC - Permit Finaled | 4/2/2004 | 4/2/2004 | 4/2/2004 | A | PASS |
Troy Cobbley
|
|
|
Finaled by inspector at 4/2/2004 9:19:21 AM
|
INSP-Final Inspection | 3/16/2004 | 3/18/2004 | 3/18/2004 | A | FAIL |
Troy Cobbley
|
|
|
need shell system finaled. Everything else is ok 3/18/2004 9:48:55 AM
|
INSP-Sprinkler Rough-in/Hydro | 3/10/2004 | 3/11/2004 | 3/11/2004 | A | FAIL |
Troy Cobbley
|
|
|
Extended coverage pendants have been installed in locations shown for standard coverage pendants. Provide correct pendant or approval from Bill Alexander for change of installation. Provide additional hangers on all arm overs exceeding 24" in length per NFPA 13 9.2.3.5.1. Provide final for the shell system. This inspection was for rough-in only. 3/11/2004 10:45:29 AM
|
Override - Parcel Holds | | | 2/13/2004 | | |
|
|
|
|
Issue and Print Permit | | | 2/13/2004 | | DONE |
|
|
|
|
Plan assigned to (Bill) | 1/27/2004 | | 2/12/2004 | | DONE |
Bill Alexander
|
|
|
|
Sprinkler Plan Check | 1/27/2004 | | 2/12/2004 | | PASS |
Bill Alexander
|
|
|
Approved with exceptions noted in the review notes.
|
Miscellaneous action | | | 2/12/2004 | | DONE |
|
|
|
Emailed the following to Bob Knight, 02/12/02, 11:06am.
I don't see a "FINAL" head analysis sheet in these calcs and not all the required friction loss for piping was included for an actual spacing of 400-ft/2 between the heads on the lines and between the lines? This type of calculating is saying I can go 5 miles on 1/8 gallons of gas, but you don't figure it's all uphill.....?
I can accept this design "AS IS" for the actual spacing/design shown on the plan since you only calculated the density for a spacing of 400ft/2 without adding the required pipe friction loss of pipe to get to that spacing. You have to get there from somewhere? It just does not happen, so tell me what you want to do? "As Is" or resubmit with correction?
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 2/12/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 2/12/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 2/12/2004 | | |
|
|
|
|
Inspection Record Card- Fire | 2/12/2004 | | 2/12/2004 | | DONE |
|
|
|
|
Telephone call | | | 2/12/2004 | | DONE |
|
|
|
Spoke with Bob and told him that permit is ready & fees//2/12/04 3:39pm BAM
|
Application received | | | 1/27/2004 | | |
|
|
|
|