Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberFIR04-00069
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 404 S 8TH ST (BASE / 1ST / 2ND FLRS)
Project NameSPR 8TH STREET MARKETPLACE
Customer Number 
ePlanReview 
Description
(8TH STREET MARKETPLACE - BUILDING 404 - BASEMENT/1ST/2ND FLOORS) Add and modify fire sprinklers in and existing fully sprinklered building for the remodel of areas located in the basement and on the 1st and 2nd floors in "The 8th Street Market Place", addressed as 404 S. 8th Street. Fire sprinkler work is related to the new core restrooms in the basement and on the 2nd floor, a wheelchair lift, a new 8th Street entrance, new Broad Street entrances and an expanded roof structure. PA Northwest portion of an outside canopies appears to be getting enclosed of which new lines will be installed and old sidewalls (dry) will be removed and pluged. This building is fire sprinklered to substitute for 1-hr fire-resistance rated construction. The fire sprinkler system work shall comply with IFC 2000, attached review comment and conditions list, as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-02412.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/12/20095/12/20095/13/2009APASS
DetailsForrest France
Fire sprinkler permit finaled.
INSP-Final Inspection5/11/20095/11/20095/13/2009PPASS
DetailsForrest France
Dry sidewalls are installed, noted one missing escutcheon at the womens restroom-contractor to install while on site, permit okayed for final.
Case Summary  4/13/2006  
INSP-Final Inspection5/20/20045/21/20045/21/2004AFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/20/2004 at 12:02:23 PM. Contact: ###-####. Dry sidewall heads not installed 5/21/2004 9:01:17 AM
INSP-Final Inspection5/18/20045/18/20045/18/2004PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 5/18/2004 at 8:01:52 AM. Contact: ###-####. Sidewalls at north entry not installed so stopped inspection 5/18/2004 2:46:22 PM
CHANGE STATUS TO (ISS)  3/9/2004 DONE
(F) Reprint permit  3/9/2004 DONE
Sprinkler Plan Check2/6/2004 3/8/2004 PASS
DetailsBill Alexander
Plan assigned to (Bill)1/30/2004 3/8/2004 DONE
Inspection Record Card- Fire3/8/2004 3/8/2004 DONE
Permit Ready to Issue  3/8/2004 DONE
Telephone call  3/8/2004 DONE
permit ready and fee due
Plan resubmittals received  2/6/2004 DONE
Issue and Print Permit  2/3/2004 DONE
Permit Ready to Issue  2/2/2004 DONE
Inspection Record Card- Fire2/2/2004 2/2/2004 DONE
Telephone call  2/2/2004 DONE
Spoke with Brodie and told him that permit is ready & fees//2/2/04 8:20am BAM
Application received  1/30/2004  
Plan assigned to (Bill)1/30/2004 1/30/2004 DONE
Sprinkler Plan Check1/30/2004 1/30/2004 PART
DetailsBill Alexander
Plans are poor and need resubmitting. Verification of spacing, and possible wrong head application being used.