Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberFIR04-00112
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3082 S BOWN WAY
Project NameSPR UG Bown Crossing Mrkt Pl
Customer Number 
ePlanReview 
Description
(Bown Crossing Market Place-Bldg C) * To install a 6" C-900 underground fire service supply main, from a service tap off Riverwalk Drive North East, approximately 22'-0", then North approximately 13'-0" into the back center and up through the floor with 6" Ductile Iron, to approximately 6" above the floor, within a new 5,550-ft/2 two story, multi-tenant, shell only building. Separate permits and plans must be obtained and approved for the overhead shell and each tenant space to be occupied. This building is fully fire sprinklered for Code reduction and fire flow. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 and the IFC-2002, attached review comment and conditions list, all as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-02191.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Supply line flush7/1/20047/1/20047/1/2004PPASS
DetailsRick Jackson
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes UG permit completed 7/1/2004 4:17:43 PM
DOC - Permit Finaled7/1/20047/1/20047/1/2004PPASS
DetailsRick Jackson
Finaled by inspector at 7/1/2004 4:17:47 PM
INSP-Sprinkler Rough-in/Hydro5/13/20045/13/20045/13/2004PPASS
DetailsRick Jackson
sam; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Hydro only okay 5/13/2004 2:31:10 PM
INSP-Sprinkler Rough-in/Hydro4/26/20044/26/20044/26/2004PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 4/26/2004 at 8:45:19 AM. Contact: ###-####. UG line complete; still needs flush and hydro 4/26/2004 4:12:21 PM
INSP-Sprinkler Rough-in3/29/20043/29/20043/29/2004PPART
DetailsRick Jackson
sam; Phone #: ###-#### Internet Inspection Request from: Darla Downs UG stub out okay; used uni-piece instead of ductile 3/30/2004 7:40:55 AM
CHANGE STATUS TO (ISS)  3/16/2004 DONE
Inspection Record Card- Fire3/11/2004 3/11/2004 DONE
Telephone call  3/11/2004 DONE
permit ready
Permit Ready to Issue  3/11/2004 DONE
Plan resubmittals received  3/10/2004  
Plan assigned to (Bill)3/10/2004 3/10/2004 DONE
Issue and Print Permit  2/19/2004 DONE
Plan assigned to (Bill)2/17/2004 2/18/2004 DONE
Sprinkler Plan Check2/17/2004 2/18/2004 PASS
DetailsBill Alexander
This is an underground fire service supply permit only.
PLANS/APPL TAKEN TO FRONT DESK  2/18/2004 DONE
Permit Ready to Issue  2/18/2004 DONE
Inspection Record Card- Fire2/18/2004 2/18/2004 DONE
Telephone call  2/18/2004 DONE
Left message that permit is ready & fees//2/18/04 4:20pm BAM
Application received  2/17/2004