Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberFIR04-00115
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 3064 S BOWN WAY
Project NameSPR UG Bown Crossing Mrkt Pl
Customer Number 
ePlanReview 
Description
(Bown Crossing Market Place-Bldg D) * To install a 6" C-900 underground fire service supply main, from a service tap off Riverwalk Drive South East, approximately 98'-0", then North approximately 19'-0" into the back South West Corner of the building, and up through the floor with 6" Ductile Iron, to approximately 6" above the floor, within a new 7,100-ft/2 two story, multi-tenant, shell building, with the second floor for residential. Separate permits and plans must be obtained and approved for the overhead shell and each tenant space to be occupied. This building is fully fire sprinklered for Code reduction and fire flow. The fire sprinkler underground work shall comply with NFPA 13-2002, NFPA 24-2002 and the IFC-2002, attached review comment and conditions list, all as regulated by the Fire Chief. These notes, permit and fire "Inspection Card" are required to be on site as a condition of this work, to provide witness of compliance verification of minimum code. This permit is attached to building permit: BLD03-02192.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Supply line flush7/19/20047/20/20047/20/2004PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 7/19/2004 at 12:56:39 PM. UG completed 7/20/2004 3:16:13 PM
DOC - Permit Finaled7/20/20047/20/20047/20/2004PPASS
DetailsRick Jackson
Finaled by inspector at 7/20/2004 3:16:15 PM
INSP-Sprinkler Rough-in/Hydro5/13/20045/13/20045/13/2004PPASS
DetailsRick Jackson
sam; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Hydro only okay 5/13/2004 2:30:51 PM
INSP-Sprinkler Rough-in/Hydro4/26/20044/26/20044/26/2004PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 4/26/2004 at 8:43:43 AM. Contact: ###-####. UG line complete; still needs flush and hydro 4/26/2004 4:11:56 PM
Plan assigned to (Bill)2/17/2004 2/19/2004 DONE
Sprinkler Plan Check2/17/2004 2/19/2004 PASS
DetailsBill Alexander
Faxed permit application...covers only the fire service underground supply only.
PLANS/APPL TAKEN TO FRONT DESK  2/19/2004 DONE
Permit Ready to Issue  2/19/2004 DONE
Inspection Record Card- Fire2/19/2004 2/19/2004 DONE
Telephone call  2/19/2004 DONE
Spoke with Jeff Anderson and told him that permit is ready & fees//2/19/04 2:12pm BAM
Issue and Print Permit  2/19/2004 DONE
Application received  2/17/2004